Similar Projects
New City Hall
New Construction
Conception
$30,000,000 est. value
Clearwater, FL

Lake Tarpon Business Center
Demolition, New Construction, Infrastructure - 229,482 SF
Conception
$6,300,000 CJ est. value
Tarpon Springs, FL 34689

Deuces Rising Townhomes and Commercial Development
Design
$16,000,000 est. value
Saint Petersburg, FL

Anclote Harbor Apartments
New Construction, Infrastructure
Design
$155,400,000 CJ est. value
Tarpon Springs, FL 34689

Resurfacing
Infrastructure
Bidding
$6,990,700 CJ est. value
Pinellas Park, FL 33781

Woodrow Park Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Largo, FL 33770

City Hall
New Construction - 85,125 SF
Post-Bid
Largo, FL 33779

Pinellas County Jail Secure Entry Center (SEC) - Pinellas County
New Construction, Infrastructure
Post-Bid
$14,880,000 CJ est. value
Clearwater, FL 33762

Tarpon Springs City Clerks Office Renovation
Renovation - 2,500 SF
Results
$1,000,000 to $2,000,000 est. value
Tarpon Springs, FL 34689

Development of 1250 Cleveland Street
Infrastructure
Results
Less than $1,350,000 est. value
Clearwater, FL 33755

Construction of a New Dunedin City Hall
New Construction - 38,500 SF
Construction
$20,009,885 est. value
Dunedin, FL 34698

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

The Miramar Beach Resort
Demolition, New Construction, Infrastructure
Pending Verification
$14,300,000 CJ est. value
St Pete Beach, FL 33707

900 Central Mixed Use
Addition, Demolition, New Construction, Infrastructure, Renovation - 10,961 SF
Pending Verification
$58,100,000 CJ est. value
St Petersburg, FL 33705

Tropicana Field Redevelopment / St. Petersburg
Demolition, New Construction, Infrastructure, Renovation - 12,000,000 SF
Conception
$3,800,000,000 CJ est. value
St Petersburg, FL 33705

Last Updated 01/18/2023 11:41 AM
Project Title

Bernie McCabe 2nd District Court of Appeals Courthouse - BP 1A, BP 2A

Physical Address View project details and contacts
City, State (County) St Petersburg, FL 33701   (Pinellas County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: demolition, site work, asbestos abatement and new construction of a three story above grade municipal facility. As of January 17, 2023, a construction manager has been selected for this project. A firm construction timeline for this project has not yet been released. Phase one of this project is scheduled to be complete by March 2023, with bidding for phase 2 starting in June 2023, and overall construction is scheduled to start October 2023. BP1A Site Preparation (temporary fencing, erosion control, selective clearing & grubbing for building demo and new building pad area, cutting & capping existing wet utilities & removal for building demo, temporary wet utilities for construction and temporary trailer facilities, dewatering and earthwork for existing building demolition, earthwork for new building pad preparation, survey & layout, enabling electrical for making building safe for demolition and temporary site electrical for new construction and temporary trailer facilities); BP2A Demolition (existing building asbestos abatement, existing building demolition, selective specialty demolition of existing generator, generator fuel tank, demolition of existing utility yard slab on grade, demolition of existing irrigation pump and controller equipment, and an allowance for contaminated soils). All bidders must be prequalified with Skanska for consideration. Contact Jeff Cortney (Jeff.Courtney@skanska.com) for Skanska prequalification. Awards shall be based on the best interest of the Project as determined by Skanska. PLEASE NOTE: Overall construction cost of this project is $50 million. The value of these bid packages is estimated only.

Details

3 Stories Above Grade, 50,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents