Similar Projects
FA481921R0009 - Aircraft Clear Water Rinse Facility
New Construction, Demolition
Results
$1,000,000 to $5,000,000 est. value
Panama City, FL

W9127820R0029 Two-Phase Design Build Zone 3 - WEG Subscale Drone Facilities, Tyndall AFB, FL
New Construction - 89,633 SF
Design
$25,000,000 to $100,000,000 est. value
Tyndall AFB, FL

W9127820R0118- Zone 7, F-35 Munitions Storage Facilities, Tyndall AFB, FL
New Construction, Addition - 20,612 SF
Design
Panama City, FL 32403

Biomass Storage
Post-Bid
Panama City, FL

Sudduth Park Site Work Improvements
Renovation, Infrastructure
Results
Panama City, FL

Gore Park Site Work
Renovation, Infrastructure
Results
Callaway, FL 32404

Sports Complex Phase 3 Project: Facilities Building and Associated Sitework
New Construction, Infrastructure
Post-Bid
Lynn Haven, FL 32444

RFQ Construction Manager at Risk - Springfield Baptist Church Rebuild Project
Demolition, New Construction, Infrastructure - 8,900 SF
Bidding
$3,000,000 CJ est. value
Panama City, FL 32401

Repair Roads (Parking Lots) for Rebuild
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Tyndall AFB, FL 32403

RFQ Engineering - Bay Memorial Walking Park / Garden Club
Infrastructure
Conception
$300,000 CJ est. value
Panama City, FL 32401

Paving Improvements
Infrastructure
Bidding
$1,175,000 CJ est. value
Callaway, FL 32404

Communication Lines Installation
Infrastructure
Bidding
$500,000 est. value
Panama City, FL 32403

Repair of Bridge #460024 (CR 2302 over Fanning Bayou)
Infrastructure
Results
$123,025 CJ est. value
Southport, FL 32409

Bozeman School Addition - Field, and Site Work Phase 1
Addition, Infrastructure
Post-Bid
$350,000 est. value
Panama City, FL 32409

Bridge Repair/Rehabilitation
Infrastructure
Bidding
$4,000,732 CJ est. value
Panama City, FL 32401

Last Updated 07/25/2022 11:01 AM
Project Title

Air Force Base Rebuild - Tyndall Air Force Base

Physical Address View project details and contacts
City, State (County) Tyndall AFB, FL 32403   (Bay County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,000,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to rebuilding a Florida base. A detailed scope of work has not been released. As of June 16, 2020, the Tyndall Air Force Base has completed the Tyndall AFB Programmatic Environmental Analysis.. Information regarding design team, general contractor or method of selection have not been disclosed. A firm construction timeline has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents