Similar Projects
Lanier Filter Plant Administration Building Demolition
Demolition
Bidding
Buford, GA 30518

Scott Candler WTP Electrical Building No. 2 Structural Design Improvements And Distribution System Panels Installation
Renovation
Bidding
Doraville, Tucker, GA 30360

Riverside Drive WTP High Service Pump No. 7
Post-Bid
Gainesville, GA 30501

Water Treatment Services (Annual Contract)
Term Contract
Post-Bid
Savannah, GA 31401

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Crosstown Raw Water Pump VFD Replacement
Results
Less than $37,150 est. value
Peachtree City, GA 30269

Contract 2 - Water Plant Improvements and Concrete Rehabilation
Renovation, Alteration
Bidding
$650,000 est. value
Woodbury, GA

Loopers WTP Dewatering Facilities Upgrade
Post-Bid
Dalton, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

Terry R. Hicks Water Production Plant Liquid Lime System
New Construction
Bidding
Jonesboro, GA 30236

2019 Water Pollution Control Facilities Rehabilitation Academy Creek BGJWSC
Post-Bid
Brunswick, GA 31520

Water Treatment Plant #1 Aerator Replacement
Results
Kingsland, GA 31548

Water Treatment Plant Rehabilation
Renovation
Bidding
Marshallville, GA

Industrial Park Division 1 - Water Treatment Plant
Post-Bid
Warner Robins, GA

New Package Filtration Water Treatment Facility
New Construction
Results
Union Point, GA 30669

Last Updated 10/08/2021 09:06 AM
Project Title

Well 11 Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Americus, GA   (Sumter County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project contemplated consists of a new groundwater treatment plant, including construction of a pre-engineered metal building, installation of pre-selected and pre-negotiated pressure filters, installation of chemical storage tanks and feed systems, and associated electrical and instrumentation systems. Project also includes installation of approximately 0.5 miles of 4-inch gravity sewer.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents