Similar Projects
R--Construction Management Services-IDIQ
Design
Washington, DC

Multiple Award Construction Contract (MACC)
Design
Washington, DC - Andrews Air Force Base, MD 20762

Construction Management Services
New Construction
Bidding
Washington, DC

Design/Build USAID Phases 7&8 Project
Renovation - 120,000 SF
Bidding
$35,000,000 to $50,000,000 est. value
Washington, DC 20004

Renovate Building 303 - MACC Task Order X006
New Construction, Renovation, Term Contract - 12,278 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Washington, DC

Design Build (DB) / Ronald Reagan Building Phase 5 and 6 of USAID
Post-Bid
$20,000,000 to $25,000,000 est. value
Washington, DC

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Y--DB, WNY 46/67, Renovation of Operational Archives and Research Facility, Washington Navy Yard, D.C
- 12,450 SF
Construction
$25,000,000 to $100,000,000 est. value
Washington, DC

DC Water Fleet Maintenance Facility
- 26,200 SF
Construction
Washington, DC 20003

Access Control Point Program Design Build II -- RFI(2)
Design

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

GSA Facilities Service Call Center
Post-Bid
Washington, DC

Y--8(A) Basic Ordering Agreement for Minor General Construction Services Naval Facilities Engineering Command Washington, DC
Results
$2,001 to $1,000,000 est. value
Washington, DC

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Last Updated 02/27/2020 10:43 AM
Project Title

Y-Building 8 Renovation, Marine Barracks Washington

Physical Address View project details and contacts
City, State (County) Washington, DC   (District of Columbia County)
Category(s) Government/Public, Green Building
Sub-Category(s) LEED Certified, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the restoration and modernization of the Command Post/Building 8 at the Marine Barracks Washington (MBW). The renovation serves to: 1) create a positive and collaborative working environment which significantly improves communication, flow and quality in the workplace; 2) maximize the existing footprint to become a flexible, efficient and modern administrative space program capable of meeting the future needs of the Command Post; 3) address operational and functional space deficiencies and provide a high-performance, sustainable and safe working environment for the next fifty years. The project addresses a multitude of functional and operational deficiencies. The project will repair by replacement all building systems including the demolition and removal of all existing obsolete building materials and systems. It will replace internal non- original fixed partition walls, windows, interior and some exterior doors, internal floors, wall and ceiling hard and soft finishes. The renovation incudes the replacement of all plumbing systems and fixtures as well as upgrade of all HVAC systems. Other improvements include the installation of fire detection and suppression systems, replacement of electric power and lighting distribution lines and equipment, and upgrades to communication, security and alarm systems. The project will restore all existing historic stairways to meet safety code requirements, and incorporate one centrally located four stop elevator. Accessibility will be improved with an at-grade ADA compliant access to Building 8 from the west side. Removal and abatement of hazardous materials is necessary to create a safe working environment. The second floor breezeway connector and Kalwall enclosure to Building 9 will be repaired and refinished as part of this project. Antiterrorism/Force Protection window, door and related component upgrades are included. All work will be in compliance with applicable ATFP, Fire Safety, Seismic, Accessibility codes and requirements. Sustainable design principles will be included in the design and construction in accordance with Executive Order 13123 and other applicable regulations.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents