Similar Projects
Last Updated | 02/27/2020 10:43 AM |
Project Title | Y-Building 8 Renovation, Marine Barracks Washington |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC (District of Columbia County) |
Category(s) | Government/Public, Green Building |
Sub-Category(s) | LEED Certified, Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is for the restoration and modernization of the Command Post/Building 8 at the Marine Barracks Washington (MBW). The renovation serves to: 1) create a positive and collaborative working environment which significantly improves communication, flow and quality in the workplace; 2) maximize the existing footprint to become a flexible, efficient and modern administrative space program capable of meeting the future needs of the Command Post; 3) address operational and functional space deficiencies and provide a high-performance, sustainable and safe working environment for the next fifty years. The project addresses a multitude of functional and operational deficiencies. The project will repair by replacement all building systems including the demolition and removal of all existing obsolete building materials and systems. It will replace internal non- original fixed partition walls, windows, interior and some exterior doors, internal floors, wall and ceiling hard and soft finishes. The renovation incudes the replacement of all plumbing systems and fixtures as well as upgrade of all HVAC systems. Other improvements include the installation of fire detection and suppression systems, replacement of electric power and lighting distribution lines and equipment, and upgrades to communication, security and alarm systems. The project will restore all existing historic stairways to meet safety code requirements, and incorporate one centrally located four stop elevator. Accessibility will be improved with an at-grade ADA compliant access to Building 8 from the west side. Removal and abatement of hazardous materials is necessary to create a safe working environment. The second floor breezeway connector and Kalwall enclosure to Building 9 will be repaired and refinished as part of this project. Antiterrorism/Force Protection window, door and related component upgrades are included. All work will be in compliance with applicable ATFP, Fire Safety, Seismic, Accessibility codes and requirements. Sustainable design principles will be included in the design and construction in accordance with Executive Order 13123 and other applicable regulations. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |