Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station 1 Remodel
Renovation
Conception
$2,000,000 est. value
San Marcos, TX 78666

Cooper Street Warehouse & Storage
New Construction - 253,033 SF
Design
$10,000,000 CJ est. value
Arlington, TX 76001

Copeland Warehouse & Offices
New Construction - 203,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75261

DFW Inland Ports 1 And 2
New Construction - 505,000 SF
Bidding
$10,000,000 CJ est. value
Wilmer, TX

Equipment Shed - Longview AEM
New Construction
Bidding
$38,000 est. value
Longview, TX 75604

Store House Storage
New Construction - 85,000 SF
Sub-Bidding
$3,000,000 est. value
Cleburne, TX

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

Fire Station No. 5
Post-Bid
TX

McAllen Central Processing Center (CPC), McAllen, Texas
Renovation, Demolition - 22,000 SF
Results
$10,000,000 to $25,000,000 est. value
McAllen, TX

Storage Units
Results
San Antonio, TX 78236

HealthTrust Warehouse Renovation
Renovation
Construction
$1,200,000 est. value
Sugar Land, TX 77478

Southlake Business Park
New Construction - 182,000 SF
Construction
$10,000,000 CJ est. value
Southlake, TX 76092

Police Training Campus
Addition
Pending Verification
$2,075,000 est. value
Temple, TX 76501

Existing Fire Faciliites Expansions
Addition
Pending Verification
$21,350,000 est. value
League City, TX

Last Updated 03/10/2022 07:58 AM
Project Title

Victoria Fire Station 1 Renovation

Physical Address View project details and contacts
City, State (County) Victoria, TX 77901   (Victoria County)
Category(s) Commercial, Government/Public
Sub-Category(s) Fire/Police Station, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of renovation of a 9,571 square foot fire station along with new construction of a 2,880 square foot Storage Building. Site work to include paving work/repair, utility connections, and stormwater modifications. The renovation work includes selective demolition, new metal stud framed interior partitions, standing seam metal roofing, storefront windows and entry doors, hollow metal and wood doors, hardware, acoustical tile and gypsum board ceilings, flooring, painting, millwork, fire suppression, mechanical systems, plumbing systems, and electrical systems. The Storage Building work includes new construction of a pre-engineered metal building including foundation, hollow metal doors, steel coiling roll-up doors, metal stud interior partitions, gypsum board ceilings, painting, mechanical systems, plumbing systems, and electrical systems.

Details

,, 12,451 SF - Fire/Police Station, 9,571 SF Renovation, Fire/Police Station, 2,880 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Acoustic Treatment, Painting and Coating, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents