Similar Projects
Manning Correctional Institution - Boiler Replacement
Bidding
$300,000 to $400,000 est. value
Columbia, SC 29203

Township Auditorium Boiler Replacement
Bidding
Columbia, SC

Adjutant General Water Heater Replacement
Post-Bid
$63,000 to $73,000 est. value
Columbia, SC

Aerco Wizard Steam Fired Water Heater
Post-Bid
Columbia, SC 29210

J--Water Treatment Boiler and Chiller Plant SDVOSB or VOSB Set-Aside _ Dependent Upon Responses Received
Results
Columbia, SC

Intellihot Water Heaters
Term Contract
Results
Columbia, SC 29210

PVI Water Heater Replacement
Post-Bid
Blythewood, SC 29016

Aerco Smartplate Water Heater
Results
Less than $33,420 est. value
Columbia, SC

SC Department of Archives and History - Boilers Blowdown Separator
Post-Bid
$25,000 to $35,000 est. value
Columbia, SC 29223

Gressette Building Combined Mechanical Projects
Results
$656,222 est. value
Columbia, SC

UOFSC FY21-1206 Flora-1st Floor Mechanical UPFIT
Post-Bid
$300,000 to $400,000 est. value
Columbia, SC 29201

Hot Water Boilers - Midlands Eval. Center
Results
$48,800 est. value
Columbia, SC 29210

South Carolina Archives and History Building - Replace Hot Water Heater(S)
Post-Bid
$35,000 to $40,000 est. value
Columbia, SC 29223

Kirkland Correctional Institution - Boiler Replacement
Results
$680,000 to $739,725 est. value
Columbia, SC

Water Treatment Services
Term Contract
Results
Columbia, SC 29201

Reported 04/17/2021 12:00 AM
Project Title

J045--Boiler Life Expectancy and Damage Assessment Inspection

Physical Address View project details and contacts
City, State (County) Columbia, SC 29209   (Richland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents