Similar Projects
Port Chester Pedestrian Safety Action Plan (PSAP)
Infrastructure
Bidding
$450,000 to $475,000 est. value
Port Chester, NY 10573

Intersection and Pedestrian Improvements
Infrastructure
Bidding
Bronxville, NY 10708

Sidewalk Improvements Program
Post-Bid
Port Chester, NY 10573

Reconstruction of the Rye Town Park Beach Ramps
Post-Bid
Rye, NY 10580

Purdy`s Train Station Pedestrian Improvements
Results
Less than $581,000 est. value
North Salem, NY 10560

2020 Sidewalk and Curb Replacement
Results
Eastchester, Tuckahoe, NY

Town Senior Center Parking Lot Improvements
Infrastructure
Bidding
Mamaroneck, NY 10543

Central 5 Parking Lot ADA Asphalt
Post-Bid
Harrison, NY 10577

Webster Avenue Drainage Improvements - Washington Avenue to Lockwood Avenue
Results
New Rochelle, NY 10801

City Hall Employee Entrance Improvements
Infrastructure
Bidding
New Rochelle, NY 10801

Babbitt Road Sidewalk Improvements
Post-Bid
Bedford Hills, NY 10507

Phase V Construction of Open Space Recreation Area - 178 Warburton at the Ridgeway Infrastructure Improvements
Results
Yonkers, NY 10701

Clinton Street Sidewalks Improvement Project
Infrastructure
Bidding
Sleepy Hollow, NY 10591

Removal and Construction of Sidewalks, Concrete Curbs, etc.
Alteration
Post-Bid
Buchanan, NY

Y1lz--620-18-202 Expand Parking Lot 620-18-202 Expand Parking Lot
Results
$500,000 to $1,000,000 est. value
Montrose, NY

Reported 03/17/2022 12:00 AM
Project Title

Beechwood Avenue and 2nd Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) New Rochelle, NY 10801   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

A. In general, the work includes, but may not be limited to, the following: 1. Install all and maintain throughout construction the temporary erosion and sediment control measures. 2. Execute test pits. 3. Demolish and remove structures, pipes, curbs, and sidewalks as outlined on the Contract Documents. 4. Excavate and install top slap and access openings to structure in the middle of the intersection. 5. Install all drainage structures and pipes. 6. Install all curb and sidewalks. 7. Topsoil and seed all disturbed areas. 8. Demolish and remove existing structures, fences, etc located at outlet structure. Inspect and clean all new and adjacent drainage structures. 9. Repair and restoration of Work damaged during construction cleaning, Maintaining and Restoration of the site as shown and called for within he contract documents. 10. Remove all temporary sediment control features. 11. As-built Survey 12. Close out documents 13. within the Contract Drawings and specified herein.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Preparation, Landscape Grading, Topsoil Placement and Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents