Similar Projects
Farlington Fish Hatchery Addition
Addition, Demolition, Infrastructure
Design
$542,677 CJ est. value
Farlington, KS 66734

Grading and Surfacing
Infrastructure
Bidding
$5,000,000 CJ est. value
Ford, KS 67842

Grading and Surfacing
Infrastructure
Bidding
$5,000,000 CJ est. value
Ford, KS 67842

2022 City-Wide Pavement Maintenance Project
Infrastructure
Post-Bid
Baldwin City, KS

Hot Mix Asphalt (HMA) - Paving Surface Improvement Project
Infrastructure
Post-Bid
$293,000 est. value
Burlington, KS

Mill and Overlay
Results
$831,421 est. value
KS

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

Flint Hills Orthopedic Expansion
Addition, Demolition, Renovation, Infrastructure - 5,000 SF
Pending Verification
$1,500,000 CJ est. value
Andover, KS 67002

Polo Fields South
New Construction, Infrastructure
Pending Verification
$8,200,000 CJ est. value
Overland Park, KS 66221

Grading and Bridge
Infrastructure
Bidding
$900,000 CJ est. value
Elk Falls, KS 67345

RFP Engineering - Engineering Services - WaterOne Kansas River Hydropower Generation
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Lenexa, KS 66215

Milling and HMA Overlay
Infrastructure
Results
KS

Archers Landing at Sundance Ridge Third Plat
New Construction, Infrastructure
Pending Verification
$180,000,000 CJ est. value
Overland Park, KS 66204

Greenhouse Shed
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Winona, KS 67764

Milling and Hma Overlay
Infrastructure
Results
KS

Last Updated 09/10/2022 04:01 AM
Project Title

Ulysses Airport - Rehabilitate Runway 17-35

Physical Address View project details and contacts
City, State (County) Ulysses, KS 67880   (Grant County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid Rehabilitate Runway 17-35 Remark Runway 17-35, Parallel Taxiway, and Connecting Taxiways Rehabilitate Runway 17-35 Questions concerning the Plans and Specifications for this project should be directed to Ryan DaMetz, P.E. at H.W. Lochner's Office in Lenexa, Kansas at (816) 945-5840. MBE (5.7%), WBE (6.9%), DBE (0%) The anticipated early NTP date is September 2022 and the late NTP date is March 2023 Cost estimate: $300,000-$500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Airfield Signaling and Control Equipment.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents