Similar Projects
Last Updated | 07/20/2023 04:04 PM |
Project Title | 2023 Residential Sidewalk Repair Program |
Physical Address | View project details and contacts |
City, State (County) | Ellensburg, WA 98926 (Kittitas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $292,943 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of July 10, 2023, project not yet awarded. It will go to council on July 17, 2023. The project consists of furnishing all labor, materials, equipment, and other miscellaneous items to remove existing sidewalk, curb and gutter, pavement, and subgrade; prep subgrade, place and compact top course, construct cement concrete curb, gutter, sidewalk; and curb ramps; construct drive approaches; install stormwater drainage and patch asphalt. Schedule " B " requires the furnishing of all labor, materials, equipment, and other miscellaneous items to demolish and install a concrete parking pad at the City Mechanic ' s Shop. Schedule " C " consists of furnishing all labor, materials, equipment, for the City to install an EV charger at City Hall for public use. Schedule " D " requires the furnishing of all labor, materials, equipment, and other miscellaneous items to build compliant bus stop deployment pads. Schedule " E " and " F " are the City of Ellensburg ' s street related concrete work and utility related concrete work respectively, and shall be used throughout the year on an as needed basis. City of Ellensburg, Washington, reserves the right to reject any or all bids and to waive irregularities or informalities in the bid or in the bidding. Responsibility and competency of bidders and their subcontractors will be considered in making the award *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |