Similar Projects
Spring-Fishburne Drainage Basin Improvements Phase 5 - Pump Station - City of Charleston
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Charleston, SC 29401

Pump Station 104 Rehabilitation - Dorchester County
Renovation
Conception
$500,000 CJ est. value
Summerville, SC 29483

Huger Street Pump Station and Community Area
New Construction, Infrastructure
Design
$9,500,000 CJ est. value
Charleston, SC 29403

RFQ Construction Manager at Risk - West Ashley Sewer Tunnel Extension (Waste) Project
Infrastructure
Bidding
$70,000,000 CJ est. value
Charleston, SC 29401

Sanitary Sewer Improvements Shore Road Pump Station By-Pass Pump
Infrastructure
Bidding
$500,000 CJ est. value
Gilbert, SC 29054

Maryville School Lift Station Replacement
New Construction, Infrastructure
Post-Bid
Georgetown, SC 29440

Fall Creek Service Water Pump Station Project and 3" By-Pass Main
New Construction
Post-Bid
Salem, SC 29676

Broadway at the Beach Pump Station Rehabilitation
Results
$400,000 est. value
Myrtle Beach, SC 29578

Berkeley Dorchester Interconnect Division II
New Construction, Infrastructure
Results
Ridgeville, SC

Construction of the Little Thicketty Creek Pump Station Upgrade
Renovation
Construction
$898,862 CJ est. value
Cowpens, SC 29330

Wild Dunes Pump Station
Infrastructure
Construction
$700,000 CJ est. value
Dewees Island, SC 29451

Pump Station Upgrades and Improvements - City of Rock Hill
Renovation
Conception
$300,000 CJ est. value
Rock Hill, SC 29730

Pump Station 115 Replacement
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Summerville, SC 29483

Quarry Road and Old Norris Road Lift Stations Rehab
Infrastructure
Post-Bid
$580,000 CJ est. value
Liberty, SC 29657

Lift Station Upgrades
Renovation
Results
Olanta, SC

Last Updated 02/20/2023 06:08 PM
Project Title

North Columbia Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,875,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 20, 2023, this project was awarded to Shady Grove Construction, LLC, awarded amount is $2,874,999.75 Furnish all labor, materials, equipment, and incidentals required to construct and install the improvements to the existing pumping station facility and access drive in their entirety as shown on the Drawings and as specified herein. The Work includes, but is not necessarily limited to, the following major items: 1. Civil and site improvements: Demolition of the existing standby generator system, building and diesel fuel system. Demolition of existing steel antennae tower (currently not in use). Repair and paving of the existing pump station access drive from Lucius Road to the pump station site. Site grading and drainage associated with installation of new standby diesel engine generator system. 2. Process mechanical improvements: Relocation of two supplemental pumping units currently located in the pump station influent channels immediately ahead of the wet wells. The existing pumping equipment itself will be reused but piping and mounting systems will be modified. Replacement of two of the existing 250-HP main sewage pumps and associated piping and mounting provisions. The new pumping units will be supplied by the Owner. Procurement of spare parts for four existing 150-HP sewage pumps. See spare part list section 43 23 80.01. No modification to the existing pumps are included in this Contract. Replacement of the existing dry well sump pump system and piping. Replacement of the existing backflow preventer on the city water supply to the station. 3. Structural modifications: Construction of a new elevated concrete platform to support a new standby diesel engine generator system. Pressure-washing of all interior concrete surfaces insides the pump station dry well. 4. Electrical and instrumentation improvements: Installation and removal of temporary engine generator system and associated electrical work for temporary power supply as specified. Installation of a new 1,000-kW diesel generator set with sound attenuating enclosure and associated electrical improvements to connect with the existing pump station electrical power system. Replacement of the existing programmable logic controller (PLC) and operator interface in the main pump station control panel. Modifications to the existing PLC programming to incorporate a revised pump control strategy for the six main sewage pumps. See Spec. Section 40.61.96. Replacement of two existing pressure transmitters located inside the pump station including new cabling, conduit, and connection to existing pump station control system. Provide new conduit and wire for motorized gate actuator on upper level of pump station. The work of this Contract is located at the existing North Columbia Pump Station (NCPS) site. The address of the facility is 3247 Lucius Road, Columbia, South Carolina 29201. The access drive to the pump station site is located on easements on two separate properties. The pump station site proper is located on property owned by the City. The site proper is located directly between the Riverside Apartments on the east and the Columbia Canal and a CSX rail line on the west. Last Day for Questions December 6, 2022 at 12:00 P.M. ET All questions must be submitted to: https://columbiasc.ionwave.net.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents