Similar Projects
Salton Sea Sra Intrusion Alarm
Alteration
Bidding
$20,000 est. value
CA

Design-Build Solar Photovoltaic with Battery Energy Storage
Alteration
Bidding
Stockton, CA 95207

H--LBAO Generator Maintenance Services
Term Contract
Post-Bid
Carson City, Nixon, NV 89424

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

Provide, Install, and Maintain a 25Mb Etht End-To-End LSE on IGO Bull.
Term Contract
Results
Lemoore, CA 93245

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

CRCP, Fiber Optic Cable, and HMA
Infrastructure, Alteration
Bidding
$52,000,000 est. value
CA

Professional Consulting Audio/Visual Services
Alteration
Post-Bid
Yuba City, CA 95993

Video Surveillance System (VSS)
Term Contract
Results
San Francisco, CA

Provide, Install, And Maintain A Lease 10Gb Wave Service
Term Contract
Bidding
Beale AFB, Camp Pendleton, CA 92055

FANUC Robot Tabletop Systems
Renovation, Alteration
Post-Bid
Bakersfield, CA 93314

Millbrae Recreation Center - Low Voltage Systems Installation
Infrastructure
Results
Millbrae, CA 94031

IT Phase 4 Data Cabling Project
Alteration
Bidding
Novato, CA 94947

Electrical Conditions Assessment and Developing Preventative Maintenance Plan Prospective Consultants
Alteration
Post-Bid
Jurupa Valley, CA 91752

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Last Updated 03/01/2022 11:05 AM
Project Title

Fixed Camera Infrastructure Project

Physical Address View project details and contacts
City, State (County) Port Hueneme, CA   (Ventura County)
Category(s) Single Trades
Sub-Category(s) Electric, Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install all material necessary and require including the expansion of the fiber optic network and the electrical infrastructure to support the fixed camera installation within the North and South Terminals.

Details

Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents