Similar Projects
Dry Run Area Sewers Phase 2 Contract Round Bottom Road - Metropolitan Sewer District of Greater Cincinnati
New Construction, Infrastructure
Design
$5,184,500 CJ est. value
Milford, OH 45150

SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

Two Lane Resurfacing - SR 133
Infrastructure
Bidding
$8,418,990 CJ est. value
Williamsburg, OH 45176

Bridge Repair - FY2024
Infrastructure
Bidding
$553,480 CJ est. value
Batavia, OH 45103

MCWWTP Disinfection and Outfall
Renovation
Post-Bid
Cincinnati, OH

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Business 28 Sidewalk and Water Main, Cook Road Sidewalk
Infrastructure
Results
$1,286,315 CJ est. value
Milford, OH 45150

CLE-US50/SR132-Intersections
Infrastructure
Results
$3,397,900 CJ est. value
Union Township, OH 45103

St Columban Community Center
Addition, Infrastructure - 15,373 SF
Construction
$4,000,000 CJ est. value
Loveland, OH 45140

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

New Elementary School - Williamsburg Local School District
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Williamsburg, OH 45176

Roadway Minor Rehab - SR 32
Infrastructure
Design
$7,078,610 CJ est. value
Batavia, OH 45103

Complete Streets Project at U.S 52 - New Richmond
Infrastructure
Post-Bid
$8,250,000 CJ est. value
New Richmond, OH 45157

State Route 48 at West Loveland Avenue Right Turn Lane Project
Infrastructure
Results
$303,037 CJ est. value
Loveland, OH 45140

Nestle Purina Wet Food Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Union Township, OH 45103

Last Updated 10/13/2023 02:34 AM
Project Title

Middle East Fork Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Batavia, OH 45103   (Clermont County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $6,993,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Project is generally defined as the construction of a headworks vortex grit removal and mechanical screening systems, aeration tank turbo blowers and piping, return activated sludge pumping, post-aeration basin positive displacement blowers, septage receiving station and transfer pump station, non-potable water pump, standby generator, and electrical and control system, piping, and appurtenance upgrades to be installed within new and existing facilities and piping systems, at the Middle East Fork WWTP, located at 4409 Haskell Lane in the Village of Batavia. The Owner expects to proceed with the construction under the Project immediately after satisfactory acceptance and award of the construction bid and execution of the contract, with completion of all work within 730 calendar days from the date of the Notice to Proceed. Each Bidder must submit their bid in TRIPLICATE, one (1) original and two (2) copies with each copy stamped "COPY". Each bidder must deposit with his bid, security in the amount of 100% of the bid if in the form of a Bid Bond or in the amount of not less than ten (10%) percent of the bid if in the form of a certified check, cashier's check or letter of credit, for and subject to the conditions provided in the Information for Bidders and pursuant with Ohio Revised Code Section 153.54. The information for Bidders, Form of Bid, Form of Contract, Plans, and Specifications including Forms of Bid Bond, Performance-Payment Bond, and other Contractor Documents may be examined at the following Location: Clermont County Water Resources Dept. Sanitary Engineering Division 4400 Haskell Lane Batavia, Ohio 45103 (513) 732-8864 The Board of County Commissioners, Clermont County, Ohio, reserves the right to reject any and all bids, to waive any informalities in the bidding procedure, to accept any bid which it deems to be for the best interest of the County and to hold such bids for a period of sixty (60) days before taking action to award a contract. These rights are reserved up until the time the contract is signed by the Board of County Commissioners.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents