Similar Projects
The Patriot Building
New Construction - 14,000 SF
Conception
Dunkirk, MD 20754

South Lake Development - Master Plan
New Construction - 5,272 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bowie, MD 20715

Heritage Green
New Construction
Design
La Plata, MD

The Estates at Rosehaven Manor
New Construction
Design
Frederick, MD 21701

Intralox
Renovation - 18,595 SF
Bidding
Hanover, MD 21076

Beards Hill Road Development
New Construction
Bidding
Aberdeen, MD 21001

Floor & Decor
New Construction - 83,048 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Baltimore, MD 21234

Pearlstone Lodge Addition
New Construction - 14,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Reisterstown, MD 21136

Family Dollar #791792
Build-Out - 9,000 SF
Post-Bid
Waldorf, MD 20601

Beacon Pointe Leasing Office
Renovation - 1,890 SF
Results
Sparrows Point, MD 21219

Pine Street Neighborhood Revitalization Project
Demolition
Results
Cambridge, MD 21613

TopGolf
New Construction - 65,000 SF
Construction
Baltimore, MD 21230

The Paramount
New Construction, Demolition - 80,000 SF
Construction
$50,000,000 est. value
Baltimore, MD 21230

Hillman Garage and City Dock Redevelopment
New Construction
Pending Verification
$56,000,000 to $62,300,000 est. value
Annapolis, MD

Locust Hill - Phase I
New Construction
Pending Verification
Upper Marlboro, MD

Reported 01/26/2022 08:28 AM
Project Title

Purchase and Development of a Mixed-Use Project on Center Street

Physical Address View project details and contacts
City, State (County) Frostburg, MD 21532   (Allegany County)
Category(s) Commercial, Residential
Sub-Category(s) Office, Retail, Single-Family Homes
Contracting Method Competitive Bids.
Project Status No Responses Submitted, Project to Rebid
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Developers (or multi-firm project teams) interested in the purchase of 8 vacant parcels of land, comprising one City block and developing the block as a mixed-use property. The residential component should be purposefully designed for professional housing and the first-floor space planned for commercial or office space that uniquely complements the college setting.

Details

Retail, Renovation, Office, Renovation, Single-Family Homes, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents