Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Intersect Modif
Infrastructure
Design
$2,600,000 CJ est. value
Binger, OK 73009

Resurface, Bridge Rehabilitation, and Cable Barrier I-40
Infrastructure
Bidding
$10,974,715 CJ est. value
Hydro, OK 73048

Resurface, Bridge Rehabilitation, and Cable Barrier I-40
Infrastructure
Bidding
$10,974,715 CJ est. value
Hydro, OK 73048

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Hinton Waterline Extension
Infrastructure
Results
$325,000 est. value
Hinton, OK

Slabjacking and Subsealing Services
Infrastructure
Results

SH 09 - Utilities
Infrastructure
Design
$508,453 CJ est. value
Anadarko, OK 73005

Stephenson-Taylor Water Line Extension
Infrastructure
Post-Bid
$250,000 CJ est. value
Binger, OK 73009

Pavement Rehabilitation (Dbr/Diamond Grind) H.E. Bailey Turnpike: from M.P. 62.0 Extend Northeast To M.P. 78.0
Infrastructure
Results

Utilities - SH 58
Infrastructure
Design
$600,000 CJ est. value
Carnegie, OK 73015

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Silver Buffalo Casino and Food Distribution Building
Term Contract, Alteration
Results
$500,000 to $1,000,000 est. value
Anadarko, OK 73005

Grade, Drain and Surface - SH 8
Infrastructure
Design
$11,925,000 CJ est. value
Gracemont, OK 73042

Last Updated 01/27/2023 02:36 AM
Project Title

Grade, Drain and Surface - US 277

Physical Address View project details and contacts
City, State (County) Cyril, OK 73029   (Caddo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2025
Bids Due View project details and contacts
Estimated Value $13,443,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-277: From 2.57 Mis W. Of Grady C/l at the N. Curve in the E. Edge of Cement, Ext E. Approx 4.0 Mis to Middle Bills Cr Br. (New Align) As of January 27, 2023, the project is in Design status. Anticipated letting month/year is March, 2025. Length : 4.000 Mi. OKDOT - Grade, Drain and Surface - US 277 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents