Similar Projects
Intersection Improvements - CSAH 13 - CP 0013-369675
Infrastructure
Conception
$2,200,000 est. value
Muskogee, OK 74401

Deep Fork Greenway Trail - Northeast Oklahoma City (Ward 7)
Infrastructure
Conception
Oklahoma City, OK

Contractor - CHIC 313113, Pavement Improvements
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Sulphur, OK 73086

Utilities - US 64
Infrastructure
Design
Less than $300,000 est. value
Alva, OK

Kickapoo Street Sidewalk Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Kickapoo Street Sidewalk Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Resurface (Asphalt)
Post-Bid
OK

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Pavement Rehabilitation (Asphalt)
Results
Geary, OK

Pavement Rehabilitation (Asphalt)
Results
Geary, OK

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

BSSC Resurfacing of South Sooner - South Sooner Road from South East 89th Street to I-240 bridge (Ward 4)
Alteration
Conception
$1,600,000 est. value
Oklahoma City, OK 73195

Interchange - US 40
Infrastructure
Design
$43,000,000 est. value
Oklahoma City, OK 73195

Flow Equalization Basin Joint and Crack Repair
Infrastructure
Bidding
$1,000,000 est. value
Tulsa, OK

Concrete and Grading Construction Services Fire Station 1
Infrastructure, Alteration
Post-Bid
Claremore, OK

Last Updated 07/22/2022 04:33 AM
Project Title

Utilities

Physical Address View project details and contacts
City, State (County) Tishomingo, OK 73460   (Johnston County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $932,931 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-99: From Approx. 0.61 Mi North of Sh-22, North Approx. 5.31 Mi (Ut for 23267(04) As of July 22, 2022, the project is in Final Planning status. Anticipated letting month/year is May, 2022. Length : 5.310 Mi . OKDOT - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents