Similar Projects
Last Updated | 10/16/2023 03:33 AM |
Project Title | Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) |
Physical Address | View project details and contacts |
City, State (County) | Fe Warren Afb, WY 82005 (Laramie County) |
Category(s) | Heavy and Highway, Industrial/Manufacturing, Sewer and Water |
Sub-Category(s) | Industrial Warehouse, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The construction acquisition method is design-bid-build (construction). Construct a multi-story Missile Handling Complex (MHC) at FE Warren AFB in Cheyenne, Wyoming: This project will be executed using a Design-Bid-Build (DBB) project delivery method. This project consists of constructing two (2) large structures, one (1) housing the Missile Handling Facility and a second combining the Transporter Storage Facility and Missile Handling Administrative Facility for the Ground Based Strategic Deterrent Intercontinental Ballistic Missile (ICBM) mission. The Missile Handling Facility (MHF) will contain three (3) missile bays and a staging area. The missile bays and staging area are situated on an elevated concrete platform. The MHF is generally constructed from concrete, steel, concrete masonry units, insulated metal panels and standing seam metal roof. The MHF includes mechanical, electrical and fire pump rooms, training room, equipment storage and restrooms. The Transporter Storage Administration Facility (TSAF) will contain six (6) transporter storage bays allowing pull through capability. The TSAF is generally constructed from concrete, steel, concrete masonry units, insulated metal panels and standing seam metal roof. The TSAF mechanical, electrical and fire pump rooms, training room, equipment storage and restrooms. The TSAF also includes private offices, open work areas, conferences rooms, locker rooms, break rooms, and storage/supply rooms. Portions of the TSAF will meet Intelligence Community Directive 705 technical standards (ICD/ICS 705) and include mitigation measures for direct hostile threats. The project includes concrete paving, asphalt paving, site security fencing, and site utilities: electrical, communications, water, sanitary sewer, storm drainage. The project will comply with all applicable Department of Defense (DoD), Air Force, and base design standards. The project will use local materials and construction techniques where cost effective. The Contractor must build facilities as permanent construction in accordance with the DoD UFC 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements." This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems." The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 800 calendar days or a lesser proposed duration after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The estimated construction cost of this project is between $25,000,000 and $100,000,000. NOTE 1: See Solicitation Section 00 21 00, Para 2 (Pages 10-11) for obtaining Specifications & Drawing Sheets NOTE 2: See Solicitation Clause 52.236-27 Alt I for Site Visit information (Page 19). Requires action by 25 Aug to participate *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, New Construction, New Construction.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |