Similar Projects
River Sand Top Dressing for Athletic and Band Fields
Bidding
Rock Hill, SC

Landscaping and Ground Care Services
Term Contract
Post-Bid
Rock Hill, SC 29732

Cherry Road Tree Planting Project
Post-Bid
Rock Hill, SC 29731

USDA Forest Service Southern Region 8- Disaster Recovery
Results
$250,000 to $7,000,000 est. value

Glencairn Garden Landscape Drainage Installation
Results
Rock Hill, SC

Turf Care Services
Term Contract
Post-Bid
Rock Hill, SC

Operations Center Grounds Maintenance
Term Contract
Post-Bid
Rock Hill, SC

Lawn Care Services
Post-Bid
York, SC 29745

Limb and Brush Pile Removal
Post-Bid
SC

Athletic Turf Management
Term Contract
Post-Bid
SC 29715

Cemeteries Grounds Maintenance
Term Contract
Post-Bid
Rock Hill, SC 29730

Winthrop University On-Call Tree Service
Term Contract
Post-Bid
Rock Hill, SC 29733

Heckle Complex Landscaping
Post-Bid
Rock Hill, SC 29732

Fertilizers and Herbicides for Athletic Fields
Post-Bid
Rock Hill, SC 29732

York Technical College Grounds Maintenance
Term Contract
Post-Bid
Rock Hill, SC 29730

Reported 10/30/2020 12:00 AM
Project Title

Roadside Vegetation Management Project

Physical Address View project details and contacts
City, State (County) York, SC 29745   (York County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists the mowing of two (2) state roads in Lake Wylie. Cutting vegetation, treating the sidewalk, and curb and gutter joints for growth, and removing debris from the sidewalk and adjacent areas. The designated work zone will be from the back of curb, the sidewalk and the five (5) foot adjacent area within the SCDOT right-of-way. Mechanically cut and remove all excessive (3” high or more) vegetation in the work area, with special emphasis on the actual sidewalk walking surface. The goal is to increase safety and comfort of the targeted pedestrians and cyclists. The project total estimated length of roadway is 25,853 linear feet, (4.9 miles).

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents