Similar Projects
Washington Circle Pavement Improvements
Bidding
Oberlin, OH

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

Elyria East Park Trail Improvement
Results
Elyria, OH 44035

LOR - Black River Bikeway Extension -Phase 4E
Results
Less than $1,750,000 est. value
Elyria, OH 44035

D03 - SRTS Elyria Township Safe Routes to School
Results
$280,652 est. value
Elyria, OH 44035

Lor-Lorain TLCI
Results
$283,119 est. value
Lorain, OH 44052

LOR-Sheffield Lake TLCI
Results
$205,148 est. value
Sheffield Lake, OH 44054

Shady Park Fitness Trail – Phase 3
Results
North Ridgeville, OH 44039

2020 Asphalt Entry Road and Parking Lot Improvements
Results
$400,000 est. value
Lagrange, OH 44050

Broadway Sidewalk Rehabilitation
Results
$178,200 est. value
Lorain, OH 44052

2020 CDBG Ely Fountain Plaza Project
Results
$108,000 est. value
Elyria, OH 44035

Concrete Parking Lot Replacement at 1604 Kansas Avenue
Results
$180,000 to $225,000 est. value
Lorain, OH 44052

2020 CDBG South Park Trail
Results
Elyria, OH 44035

2020 CDBG Downtown Sidewalk Project
Results
$18,900 est. value
Elyria, OH 44035

West Avenue Police Station Parking Improvements
Results
Elyria, OH

Last Updated 04/07/2021 09:15 AM
Project Title

Resurface, Repave and Sealcoat and Stripe the Existing Parking Lot

Physical Address View project details and contacts
City, State (County) Elyria, OH 44035   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface, repave and sealcoat and stripe the existing parking lot, approximately 70,000 square feet, located at 1885 Lake Avenue, Elyria, OH, 44035. The bids should include grinding any necessary areas for smooth transition, sweep and clean to remove loose debris, apply a tack coat of SS#1 for proper adhesion, pre-level with 448-1l surface course asphalt, install two inches of 448-1 surface course asphalt, roll and compact designated area and re-stripe new pavement in white.

Details

Division 03 - Concrete, Maintenance of Concrete, Maintenance of Precast Concrete, Resurfacing of Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Seal Coats, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents