Last Updated | 08/02/2022 06:04 PM |
Project Title | RFP - Environmental Study - Don A Tillman Bridge |
Physical Address | View project details and contacts |
City, State (County) | Green Bay, WI 54302 (Brown County) |
Category(s) | Heavy and Highway, Professional Services |
Sub-Category(s) | Bridge, Engineering |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $45,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 2, 2022, this project is in the conceptual phase. A consultant has not been selected. *The closed solicitation has been included below for reference: This project is located on Mason Street (WIS 54) at the crossing of the Fox River in the city of Green Bay, Brown County. In 2015, a feasibility study was completed that evaluated future build alternatives to rehabilitate or replace the bridge, B-05-0134. The project will refine these alternatives: major rehabilitation, complete replacement or a combination of the two for the existing bridge. The environmental study will include the limits of the work on the bridge approaches which extend the minimum distance necessary to tie back into existing Mason Street on each end. This project's environmental study will determine the selected alternative. Anticipated Construction Cost: $45,000,000 or greater The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 9.00 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview Information:Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date:08/02/2022 Interview Place:Northeast Region Office; 944 Vanderperren Way; Green Bay, WI 54304 The method of contractor selection has not been determined at this time. WisDOT - RFP - Environmental Study - Don A Tillman Bridge *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |