Similar Projects
RFP Engineering - Pepertuation - Pavement Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashwaubenon, WI 54304

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

Ancillary Structure Rehab / Replace 2021, Locations on STN Per Annual Plan
Results

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Northeast Region-Wide Deck Sealing FY21, Various Backbone Routes STH, Northeast Region-Wide Deck Sealing FY21, Various 3R/LCB Routes STH
Results

C1JZ--National Region AE IDIQ
Post-Bid
$20,000,000 est. value

Crescent Hills Subdivision Utility And Roadway
Renovation
Results
Howard, WI

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

Last Updated 08/02/2022 06:04 PM
Project Title

RFP - Environmental Study - Don A Tillman Bridge

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54302   (Brown County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Bridge, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2, 2022, this project is in the conceptual phase. A consultant has not been selected. *The closed solicitation has been included below for reference: This project is located on Mason Street (WIS 54) at the crossing of the Fox River in the city of Green Bay, Brown County. In 2015, a feasibility study was completed that evaluated future build alternatives to rehabilitate or replace the bridge, B-05-0134. The project will refine these alternatives: major rehabilitation, complete replacement or a combination of the two for the existing bridge. The environmental study will include the limits of the work on the bridge approaches which extend the minimum distance necessary to tie back into existing Mason Street on each end. This project's environmental study will determine the selected alternative. Anticipated Construction Cost: $45,000,000 or greater The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 9.00 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview Information:Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date:08/02/2022 Interview Place:Northeast Region Office; 944 Vanderperren Way; Green Bay, WI 54304 The method of contractor selection has not been determined at this time. WisDOT - RFP - Environmental Study - Don A Tillman Bridge *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents