Similar Projects
South Pinckney Street Parking Lot
Post-Bid
Union, SC

McCall Farms, Inc North Parking Lot Expansion 2018
Post-Bid
$315,000 est. value
Effingham, SC

Water Intrusion
Results
Columbia, SC

Sidewalk Package S6
Results
SC

Woodruff Streetscape
Post-Bid
$400,000 to $425,000 est. value
Woodruff, SC

Holly Hill Pedestrian Improvements US 176, MP 16.85 - MP 17.17
Results
SC

Streetscape Improvements Phase 1
Post-Bid
McCormick, SC

Tap Sidewalk Installation
Results
SC

Generations Park Walking Trail
Post-Bid
Aiken, SC

Concrete Walkway and Stairs
Results
$14,250 est. value
Duncan, SC

Furnish/Install Cabinets Waccamaw MHC
Post-Bid
Conway, SC 29526

Resurface and Restripe the Parking Lot Area
Results
$26,320 est. value
York, SC 29745

Garco and Empire Streetscape Plan
Post-Bid
North Charleston, SC

Spartanburg - TRB 94 Warehouse Parking Lot Repair
Results
$90,000 to $130,000 est. value
Duncan, SC

Viking Greenway Phase 2
Post-Bid
$70,000 to $85,000 est. value
Latta, SC

Reported 04/03/2019 12:00 AM
Project Title

Greeleyville Town Hall Accessibility Improvements

Physical Address View project details and contacts
City, State (County) Greeleyville, SC 29056   (Williamsburg County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Finishes/Interior, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description Scope of this project is to improve accessibility deficiencies in the existing Town Hall building in Greeleyville, South Carolina. The project does not alter the existing building envelope or structure. The project will include improvements to the existing parking lot and re-construction of the existing concrete ramp. Interior accessibility improvements are to include enlarged restrooms with new grab bars and accessible accessories including a new door and hardware and new accessible cabinets in the break room. Electrical work is limited to the relocation of the electrical devices and light fixtures. Plumbing work includes relocation of existing plumbing fixtures and associated piping
Details
Division 09 - Finishes.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents