Similar Projects
Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Senior Center Parking Lot Replacement
Infrastructure
Post-Bid
$176,520 CJ est. value
Rockwood, MI 48173

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

PMC Project Concrete Pavement Repair on Woodard at 8 Mile
Results
Detroit, MI

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Annual "On Call", As Needed, Concrete Sidewalk and Approach Replacement Contract
Term Contract
Post-Bid
Dearborn Heights, MI

Bundle 3 Rest Area Ada Eastern Lower Peninsula - Interior
Results

BP 3 Cambridge High School Garden City High School and Garden City Middle School Parking Lot
Infrastructure
Post-Bid
Garden City, MI 48135

City Hall Front Entrance Upgrade
Infrastructure
Results
Trenton, MI

North Service Center Pumping Station Improvements - Great Lakes Water Authority
Demolition, Renovation, Infrastructure
Post-Bid
$72,216,000 CJ est. value
West Bloomfield, MI 48323

2.10 MI of Full Depth Concrete Pavement Repairs
Infrastructure
Results
Detroit, MI

Last Updated 03/22/2023 10:41 AM
Project Title

City Hall ADA Entrance and Exit Doors Project

Physical Address View project details and contacts
City, State (County) Lincoln Park, MI 48146   (Wayne County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $87,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Lincoln Park is accepting sealed bids for the Lincoln Park City Hall ADA Entrance & Exit Doors Project. The anticipated start date is as soon as possible and substantially completed by May 31, 2023, with final completion by June 14, 2023. Questions are submitted online No

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents