Similar Projects
Rehabilitation of Screened Final Effluent (SFE) Pump Station - 216008 - The Great Lakes Water Authority
Renovation
Conception
$40,226,000 CJ est. value
Detroit, MI 48209

Oakwood District Intercommunity Relief Sewer Modification at Oakwood District - 222001 - Great Lakes Water Authority
Infrastructure
Conception
$53,466,000 CJ est. value
Detroit, MI 48226

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Playground Grades 3-5
Infrastructure
Bidding
$140,000 CJ est. value
Dearborn, MI 48126

Renovation of Hazmat Facility
Renovation, Infrastructure
Bidding
$3,731,886 CJ est. value
Detroit, MI 48209

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Replacement Sump Pumps at Townsend Towers
Renovation
Post-Bid
Dearborn, MI 48126

Replacement Sump Pumps At Townsend Towers
Renovation
Results
Dearborn, MI

Hvac Improvements Oakwood CSO Facility - 1
Renovation
Results
Detroit, MI

Remove and Replace Sidewalks
Infrastructure
Construction
$200,000 CJ est. value
Highland Park, MI 48203

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Hendrie & Palmer Mixed-Use Housing
New Construction, Infrastructure
Conception
$45,000,000 CJ est. value
Detroit, MI 48226

Romulus Corporate Park Building 3
New Construction, Infrastructure - 243,770 SF
Design
$28,000,000 CJ est. value
Romulus, MI 48174

Last Updated 10/18/2022 07:32 AM
Project Title

Rehabilitation of Pump Station 1 Improvements

Physical Address View project details and contacts
City, State (County) Detroit, MI 48209   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $89,169,985 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PN- 1007-02, 5204-03 Owner requests bids from qualified Contractors to provide construction services in connection with Pump Station No 1 improvements at the Water Resource Recovery Facility (WWRF), which has a wet weather design capacity of 1,444 MGD raw sewage. The Work includes rehabilitation/rebuild of existing pumping units; improvements to major process piping and valves; facility architectural, electrical, instrumentation, structural and HVAC improvements. The WWRF is located at 9300 West Jefferson Avenue, Detroit, MI 48209. Questions Due Date: Aug 15th 2022, 12:00 PM EDT A. Mobilize labor, equipment, materials, tools, facilities, and incidentals to the site and provide temporary facilities, utilities, field offices, pest control, project signage, environmental controls, housekeeping and progress cleaning, construction waste management, site cleaning, site security and other general requirements specified in the Contract Documents throughout the duration of the Contract. B. Provide project management, project scheduling, project communications, project meetings, document management, project controls, project supervision, and contract management required to plan and coordinate the Work of this Contract with that of other contracts being conducted simultaneously at the site as well as with the Contracting Officer's operation and maintenance of the facility so that facility and system operations are maintained, and service is not disrupted during the course of the Work. C. Execute the Work with utmost care and safety, complying with applicable local, state and federal laws, rules and regulations with respect to health, safety and the environment. . Maintain project records throughout the duration of the Contract, including but not limited to photographs, video, record documents, asset turnover forms, operation and maintenance data, and training documents as specified in the Contract Documents. E. The entire Pump Station 1 (PS-1) is to be improved. Every discipline has major improvements including process mechanical, HVAC mechanical, plumbing mechanical, electrical, I&C, architectural, structural, and site/civil. F. Improvements include but are not limited to the following: 1. Refurbish the eight existing raw wastewater pumps and bearings, with automated grease system and refurbished motors 2. Replace increaser pipes with welded steel pipe and add flow meters 3. Replace existing gates, valves, and actuators 4. Repair architectural features including new roofs, floors and doors 5. Demolish existing HVAC equipment and install new HVAC equipment 6. Replace electrical equipment in the pump station and EB-2 building 7. Construct a new electrical room with all new electrical equipment 8. Replace I&C equipment including a new pump health monitoring system and revised control room space 9. Construct paving and landscaping improvements 10. Install equipment provided by Others for MAUs and Discharge Gate Valves and Actuators 11. Remediate hazardous building materials from the site G. Seven (7) Make Up Air Units and Eight (8) Discharge Gate Valves with Actuators are being furnished by Others under a Pre-Procurement Contract. Owner is storing this equipment at the WRRF. Contractor is responsible for performing any required storage maintenance, cleaning, transport and handling from the stored location to the PS-1 facility, demolition of existing equipment, installation, start up, training coordination, and completing any other services not covered in the scope of work identified in Appendix 5- Discharge Gate Valve Pre-Purchased Equipment Details and Appendix 6 Make-Up Air Unit Pre-Purchased Equipment Details but required by the Contract documents. 1. Contractor is required to pay Use Tax applicable to this equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents