Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Melvin Price Lock & Dam Main Lock Lift Gate Install & Machinery Replacement
Infrastructure
Bidding
$10,000,000 CJ est. value
East Alton, IL 62024

Ferguson Avenue Drainage Improvements
Infrastructure
Bidding
$2,480,000 CJ est. value
Wood River, IL 62095

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Class B Patching and Other Appurtenant Work
Infrastructure
Post-Bid
Edwardsville, IL

Riverfront Development Phase 8
Results
$2,727,884 est. value
Alton, IL 62002

Roadway Resurfacing
Results
Less than $125,000 est. value
Wood River, IL 62095

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

Anderson- Goshen Campus
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Edwardsville, IL 62025

Village Hall Parking Lot Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Hamel, IL 62046

Oakland Drive Improvements
Infrastructure
Post-Bid
Edwardsville, IL

Resurfacing and ADA Improvements on IL 111/3 from Alby Street to Broadway in Alton
Results
Alton, IL 62002

Last Updated 09/30/2022 06:05 AM
Project Title

Canal Road Pump Stations No. 2 and No. 3 at Wood River Levee District

Physical Address View project details and contacts
City, State (County) Roxana, IL 62084   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $7,527,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 28, 2022 Contract Award Number: W912P922C0019 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LMH6DPYYPM15 Contractor Awarded Name: MAGRUDER CONSTRUCTION CO INC Contractor Awarded Address: Eolia, MO 63344 USA Base and All Options Value (Total Contract Value): $7527300.00 All questions resulting from the solicitation and/or site visit must be submitted via email to the Contract Specialist listed on the SAM.gov posting. All questions are due by 10:00am CST, 17 May 2022. No additional questions will be acceptetd after this date. he U. S. Army Corps of Engineers, St. Louis District, Wood River Levee District is seeking a firm for construction of installation of two (2) pump stations and two (2) relief wells. PLEASE SEE ALL ATTACHMENTS FOR FULL INFORMATION ON THIS SOLICITATION. AMENDMENT 0001 - Adds Questions & Answers, Site Visit Sign-In Sheet, updated Plans and updated Specifications. Proposal due date is NOT extended. See attachments for full details. IMPORTANT NOTE: Questions are due to WHITNEY DEE at whitney.r.dee@usace.army.mil Proposals are due to ANGIE GRIMES at angie.l.grimes@ussace.army.mil AND WHITNEY DEE at whitney.r.dee@usace.army.mil. Whitney will be out of the office for a couple weeks around the date proposals are due, so if you send to only Whitney they will not be seen. Estimated Magnitude of this Construction Project (in accordance w ith FAR 36.204) is betw een $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents