Similar Projects
Upper Main Street Parking Lot
Bidding
Bridgton, ME

1 Mile Of Plowing And Sanding
Term Contract
Post-Bid
Mariaville, ME

Plowing And Salt/Sanding
Term Contract
Post-Bid
Brewer, ME

Portland - Region 1 Signal Improvements and Sidewalk Ramp Reconstruction
Results
Portland, ME 04101

Washington Street Sidewalk Project
Results
Lubec, ME

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Bangor, ME 04401

Oxford Street Sidewalk Improvement Project
Results
Less than $600,000 est. value
Portland, ME

Sidewalk Renovation Project at EMCC Penquis Higher Education Center
Post-Bid
Dover Foxcroft, ME

Pump Station - Parking Lot / Paving Crummett Street
Results
Benton, ME

Parking Lot Expansion at EMCC Rangeley Hall
Post-Bid
Bangor, ME 04401

Concrete Sidewalk Replacement at the Esplanade
Results
Auburn, ME 04210

Asphalt Sidewalk/Curb Replacement
Post-Bid
Auburn, ME

Construction of Bike Path Extension for Riverside Park
Results
Presque Isle, ME

South and Crescent Street Sidewalk Reconstruction Project
Post-Bid
Biddeford, ME

2019 Sidewalk Improvements Pine Street and Park Street
Results
Less than $150,000 est. value
Lewiston, ME

Last Updated 07/21/2020 10:52 AM
Project Title

Recreational Trail Bridge

Physical Address View project details and contacts
City, State (County) China, ME   (Kennebec County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace a collapsed bridge with a supplied bridge crossing Hunters Brook in China at or about coordinates 44.449688 , 69.491382. All construction will meet the requirements of BPL Off Road Vehicle Division Pamphlet: Maine Motorized Trail Construction and Maintenance Manual, dated May 2020. A copy can be requested thru the Town Office or by calling the Club President at 416-2070. The rebuilt trail bridge will follow the existing route and will be set on concrete abutments with help of volunteers from CFSC, additional cleared area of 2 feet on each side and all growth will be cleared 12 feet high over the trail area. The project is approximately 75-100 feet long.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents