Similar Projects
Reported | 05/07/2022 12:00 AM |
Project Title | Goddard Middle School Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Littleton, CO 80123 (Arapahoe County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | At all low-slope/existing single ply membrane roof assemblies areas remove existing roof assemblies down to corresponding roof decks, furnish and install a new 60-mil PVC membrane roof replacement, fully adhered over new gypsum coverboard, set in low-rise foam adhesive over new rigid insulation, set in low-rise foam adhesive over new self-adhered vapor retarder, fully adhered over primed substrate board, mechanically fastened over existing structural decks as shown and specified in design documents.. At all low-slope/existing single ply membrane roof assemblies areas furnish and install new PVC flashings and sheet metal (fascia metal, parapet cap, counter flashings, roof jacks, etc.) as shown and specified in design documents. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |