Similar Projects
Market Survey - Colorado Springs ATCT (Cos) Base Building Roof Replacement
Term Contract
Design
Colorado Springs, CO

Community Center and Justice Center Roof Repairs
Alteration
Bidding
Black Hawk, CO 80422

Hoffman Heights Library Roof Replacement
Infrastructure
Bidding
$300,000 est. value
Aurora, CO 80011

Installation of TPO Roofing System (or Equivalent)
Alteration
Post-Bid
Pueblo, CO 81001

Colorado Springs Airport Building A Roof Replacement Project
Alteration
Post-Bid
Colorado Springs, CO 80916

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

2020 Sheriff's Office and Annex III Roofing Project
Results
Cortez, CO 81321

Front Range Village
Renovation
Construction
$230,000 est. value
Fort Collins, CO 80525

La Jara Roof Replacement Project
Alteration
Post-Bid
La Jara, CO 81140

Reroofing of a Certain Public Buildings
Results
Less than $278,000 est. value
Lafayette, CO 80026

Colorado Springs (COS) Base Building Roof Replacement
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Colorado Springs, CO 80902

Platte Division Roof Replacement
Results
Denver, CO

El Pueblo History Museum Roof Repairs
Alteration
Post-Bid
$30,000 est. value
Pueblo, CO 81003

City of Fort Collins - Roofing Services
Results
Fort Collins, CO 80522

Viking Square Apartments - Roof Replacement, Exterior and Additional Upgrades
Alteration
Post-Bid
Arvada, CO 80002

Reported 05/07/2022 12:00 AM
Project Title

Goddard Middle School Roof Replacement

Physical Address View project details and contacts
City, State (County) Littleton, CO 80123   (Arapahoe County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

At all low-slope/existing single ply membrane roof assemblies areas remove existing roof assemblies down to corresponding roof decks, furnish and install a new 60-mil PVC membrane roof replacement, fully adhered over new gypsum coverboard, set in low-rise foam adhesive over new rigid insulation, set in low-rise foam adhesive over new self-adhered vapor retarder, fully adhered over primed substrate board, mechanically fastened over existing structural decks as shown and specified in design documents.. At all low-slope/existing single ply membrane roof assemblies areas furnish and install new PVC flashings and sheet metal (fascia metal, parapet cap, counter flashings, roof jacks, etc.) as shown and specified in design documents.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents