Similar Projects
Emergency Generator Upgrades
Alteration
Bidding
Omaha, NE

RV Pedestal Upgrade
Alteration
Bidding
Lincoln, NE 68524

Replace the Existing Boilers and Associated Mechanical and Electrical Support Systems
Alteration
Post-Bid
Hastings, NE 68901

Uninterruptible Power Supplies Maintenance Agreement Services - Nebraska-Western Iowa VA
Term Contract
Post-Bid
Omaha, NE 68105

A3 54-Inch Bypass Isolation
Alteration
Results
Lincoln, NE 68521

Uncle Sam Jam Sound, Lighting and Staging
Alteration
Results
Lincoln, NE 68508

RV Pedestal Upgrade
Alteration
Bidding
Louisville, NE 68037

Omaha Metro Electric Charging Stations
Alteration
Post-Bid
Omaha, NE 68102

Offstreet Parking District No. 2 - Structure No. 2
New Construction, Alteration - 182,459 SF
Results
La Vista, NE 68128

Gering FMS 4 Back-up Generator
Alteration
Post-Bid
Gering, NE

Distribution Transformers
Alteration
Results
Grand Island, NE

Norfolk FMS 7 Back-up Generator
Alteration
Post-Bid
Norfolk, NE

Lincoln Theresa Street WRRF UV Improvements
Alteration
Results
Lincoln, NE 68521

Materials and Installation of 20 (Twenty) RV Electrical Hookups at Prairie Lake Recreation Area
Alteration
Post-Bid
Juniata, NE

Electrical- District 6-Districtwide CCTV Cameras
Alteration
Results
Less than $5,000,000 est. value

Last Updated 10/14/2021 07:15 AM
Project Title

Electrical- District 6 Variable Speed Advisory

Physical Address View project details and contacts
City, State (County) (Dawson, Deuel, Keith, Lincoln Counties)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0001 0030.50 Mobilization 1.000 Lump 0002 l003.51 Seeding 4000.000 Sy Group 8b Electrical 0003 0030.80 Mobilization 1.000 Lump 0004 1012.03 Fiber Marker 91.000 Each 0005 a001.05 Pull Box, Type Pb-2 102.000 Each 0006 a001.35 Pull Box, Type For-27 91.000 Each 0007 a001.39 Pull Box, Type Pb Fiber Vault 56.000 Each 0008 a003.10 Traffic Signal, Type Ts-1 98.000 Each 0009 a006.88 Pedestal Pole, Type Pp-14 98.000 Each 0010 a017.55 Pole Foundation 98.000 Each 0011 a017.61 Transformer Base 98.000 Each 0012 a020.10 Lighting Control Center, Type d 47.000 Each 0013 a074.42 2-Inch Conduit Bored 20523.000 Lf 0014 a074.43 2-2-Inch Conduit Bored 7860.000 Lf 0015 a074.52 2-Inch Conduit Plowed 33044.000 Lf 0016 a074.53 2-2-Inch Conduit Plowed 129358.000 Lf 0017 a076.13 3/c #12 Awg Traffic Signal Cable 8473.000 Lf 0018 a079.22 Tracer Wire 158232.000 Lf 0019 a079.30 #3 Awg Cu Conductor 5054.000 Lf 0020 a079.31 #4 Awg Cu Conductor 43590.000 Lf 0021 a079.43 #8 Grounding Conductor 28116.000 Lf 0022 a079.71 Terminated Fiber Connector 200.000 Each 0023 a079.72 Connector Adaptor Panel 63.000 Each 0024 a079.76 Fiber Ethernet Transceiver 39.000 Each 0025 a079.93 #0 Awg Cu Conductor 12998.000 Lf 0026 a079.96 Install Fiber Ethernet Switch 40.000 Each 0027 a081.21 12 Sm Fiber Optic Cable 172727.000 Lf 0028 a081.22 144 Sm Fiber Optic Cable 11707.000 Lf 0029 a081.31 Test Station 57.000 Each 0030 a081.32 Fiber Optic Splice 492.000 Each 0031 a081.33 Fiber Optic 12 Splice Tray 29.000 Each 0032 a081.35 Fiber Optic Splice Closure 9.000 Each 0033 a401.40 40' Tower Camera Site 4.000 Each 0034 a401.70 Camera Tower Retrofit 12.000 Each 0035 a580.88 Install Cell Modem 4.000 Each 0036 a580.88 Install Dsrc 22.000 Each 0037 a630.20 Remove Pull Box 4.000 Each 0038 a820.00 Controller Cabinet Vsa 47.000 Each 0039 a820.10 Vsa Equipment w/2 Signs 49.000 Each 0040 a960.00 Pull Tape 137731.000 Lf Group 10 General 0041 0001.08 Barricade, Type Ii 100000.000 Bday 0042 0001.10 Barricade, Type Iii 4300.000 Bday 0043 0001.75 Temporary Sign Day 16500.000 Each 0044 0001.90 Sign Day 23100.000 Each 0045 0002.97 Flashing Arrow Panel 900.000 Day 0046 0003.10 Flagging 20.000 Day 0047 0005.10 Traffic Control Management 335.000 Day 0048 0020.00 Training 100.000 Hour 0049 0030.00 Mobilization 1.000 Lump 0050 1017.70 Construction Staking 1.000 Lump 0051 l070.15 Mowing 40.000 Acre 0052 l860.50 Environmental Commitments - Contractor Compliance 1.000 Lump 0053 l860.51 Environmental Incentive 1.000 Each 0054 l860.52 Environmental Disincentive 1.000 Cday

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents