Similar Projects
Granton - Loyal Cth H to Chickadee Road
Infrastructure
Bidding
Granton, WI

Water Quality Trading Clearinghouse
Infrastructure
Bidding

2021 Highway Construction and Maintenance Materials and Services
Post-Bid
Neillsville, WI

Replace Some Sidewalks Around the Courthouse Building
Post-Bid
Neillsville, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Asphalt Street Patching and Paving
Post-Bid
Neillsville, WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Chip Sealing 6 Miles of Town Roads
Infrastructure
Post-Bid
Willard, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

North 4th Avenue Improvements
Results
Less than $750,000 est. value
Abbotsford, WI 54405

Greenwood - Spencer, Elm Drive to East County Line
Results
Greenwood, Spencer, WI

2021 Street Improvements
Results
Loyal, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Broek Road Resurfacing WisDOT LRIP-S
Results
Thorp, WI

Last Updated 01/03/2022 05:37 AM
Project Title

2021 Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Dorchester, WI   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of reconstructing South 3rd Street, North 3rd Street, portion of north front street. Work wil include excavation base course, asphalt paving, concrete curb & gutter, concrete curb & gutter, concrete sidewalk, sanitary sewer, storm sewer, watermain replacements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents