Similar Projects
Mcalpine WAS Equalization Improvements
New Construction
Bidding
Pineville, NC 28134

210 Wastewater Treatment Facility Biosolids Dewatering Facility and Solids Handling Improvements
Renovation
Bidding
$17,000,000 to $20,000,000 est. value
Smithfield, NC

Residuals Management - Wastewater Treatment Division
Post-Bid
Gastonia, NC 28052

WWTP Improvements Contract I
Post-Bid
Mount Olive, NC 28365

Wastewater Treatment Plant Improvements - Filter Replacement
Results
$1,200,000 est. value
Hendersonville, NC

Northeast Brunswick Regional Wastewater Treatment Plant 2.5 MGD Expansion
Results
Leland, NC

Contract No. 44 WWTP Clarifier Improvements
Renovation
Bidding
Warsaw, NC

Elizabeth City Raw Water Reservoir and WTP Upgrades
Renovation
Post-Bid
Less than $1,300,000 est. value
Elizabeth City, NC 27906

Big Buffalo Water Reclamation Facility Flood Rehabilitation Project
Results
Less than $4,500,000 est. value
Sanford, NC 27330

Wastewater Treatment Plant Improvements
Renovation
Bidding
Pembroke, NC 28372

Mallard Creek WRF Phase 1 Improvements Construction Manager at Risk Services
Post-Bid
$89,200,000 est. value
Charlotte, NC

West Stanly (NC) WWTP and Sanitary Sewer Improvements SRF
Results
Oakboro, NC 28129

Henry Fork Wastewater Treatment Facility Biosolids Handling Facility
Renovation, Addition - 9,696 SF
Bidding
$25,000,000 to $30,000,000 est. value
Hickory, NC

McAlpine Creek WWMF Nutrient Harvesting
Post-Bid
$13,000,000 est. value
Charlotte, NC

Wastewater Treatment Plant Influent and Headworks Screen Upgrades Project
Results
$252,000 est. value
Clarkton, NC 28433

Reported 11/02/2021 12:00 AM
Project Title

Mason Farm WWTP Fermenter Mixing Improvements

Physical Address View project details and contacts
City, State (County) Chapel Hill, NC   (Durham County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: 1. Demolition of existing pipe and mixing headers and their associated structural supports inside the fermenter tank up to wall pipe connections. 2. Demolition of two submersible pumps and associated piping up to wall the fermenter wall pipes in the basement of the Old Digester Control Building. 3. Excavation and demolition of underground fermenter gas condensate pipe, as well as its associated drip trap in the basement of the Old Digester Building. 4. Optional removal and reinstallation of a 6-foot by 6-foot section of the concrete cover for the fermenter tank to provide easier access to the interior of the fermenter. This would include the associated PVC liner repair. 5. Installation of new mixing nozzles and associated pipe and supports in the fermenter tank. This includes spot repairs to the existing PVC liner as required. 6. Installation of a vertically mounted centrifugal chopper pump in the basement vault of the Old Digester Control Building, as well as required structural modifications to fit the new pump in the vault. 7. Installation of new pipe, valves and supports in the basement of the Old Digester Control Building. 8. Installation of new gas condensate accumulator and associated drain and vent piping improvements. 9. Repair and coating of corroded sampling hatches in the fermenter cover. 10. Electrical improvements for power and controls of new equipment. 11. Installation of new level and flow instruments and integration of new controls with the plant-wide SCADA system, as defined in the CITI scope of supply (Appendix C). 12. Inspection of Fermenter Tank as described in Specification Section 03 01 00. 13. And all associated appurtenances as described in the Specifications and as shown on the Drawings.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents