Similar Projects
Wells 3 and 4 Water Treatment Plant - General Bids
Bidding
$8,400,000 est. value
Medfield, MA 02052

Well 3A Submersible Pump and Motor Replacement
Bidding
Less than $25,000 est. value
Needham, MA

Emergency Repair of Submersible Motor at Well 6
Post-Bid
Foxborough, MA 02035

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Muddy Pond Replacement Wells and Pump Station
Results
$3,000,000 est. value
Stoughton, MA

Cleaning and Redevelopment of the Town's Seven Wells
Term Contract
Results
Stoughton, MA 02072

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Well #3A Submersible Motor Replacement
Results
Less than $18,000 est. value
Needham, MA

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Installation of two New Drinking Water Wells
Results
Less than $700,000 est. value
Plainville, MA

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids
Renovation
Post-Bid
$8,400,000 est. value
Medfield, MA 02052

Public Water Drinking Well Installation
Results
Plainville, MA

Wet Well Cleaning
Term Contract
Results
Stoughton, MA

Oak Street Replacement Wells 7R, 9R, and 10R
Results
Less than $815,000 est. value
Foxborough, MA 02035

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Last Updated 04/20/2021 12:04 PM
Project Title

Peirce and Mann Halls Fire Pump, MSCBA Project - General Bids

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. The project includes replacement of the existing fire pump in Crocker Hall which provides service to Peirce and Mann Halls only at Framingham State University in Framingham, MA. Project includes select demolition and new construction work including, but not limited to: removal of fire pump and piping, installation of new fire pump, piping and required accessory components, testing, and commissioning before placing into service. Work shall include fire protection, electrical components as required; limited repair or replacement of other building components necessary to complete project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents