Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

HVAC Replacement at Wilson County Health Department
Alteration
Bidding
Wilson, NC 27893

Chiller Replacement for Andrews High School
Alteration
Bidding
High Point, NC 27265

HVAC Repairs and Maintenance
Term Contract
Post-Bid
Durham, NC 27701

Heat Controller Install
Post-Bid
Chapel Hill, NC 27516

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

EMD Facility HVAC Upgrades
Results
Wilmington, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

Unc School Of The Arts Residence Hall HVAC Phase 2
Construction
Winston-Salem, NC

Ddc Pneumatic Uplift And Commissioning Northridge Ms
Alteration
Bidding
Charlotte, NC

HVAC and Electric Renovation of the Courthouse
Post-Bid
$400,000 to $600,000 est. value
Trenton, NC 28585

Nature Exploration Center (NEC) Building HVAC Control System Replacement
- 200,000 SF
Results
Less than $1,090,000 est. value
Raleigh, NC 27601

HVAC - Insulate/Cover New Chilled Water Piping
Infrastructure
Bidding
Atlantic Beach, NC 28512

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

Seventy-First High School, Kitchen HVAC Addition
Results
Fayetteville, NC 28304

Last Updated 12/21/2021 01:46 PM
Project Title

Blue Ridge Community College Spearman Building Machining HVAC

Physical Address View project details and contacts
City, State (County) Flat Rock, NC 28731   (Henderson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $138,133
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide a turnkey project inclusive of all labor, materials, roof penetrations, roof curbs, curb and roof flashing, pads, traffic control, supervision, disposal fees, permits, inspections to install air conditioning in the Machining Lab in the Spearman building on the campus of Blue Ridge Community College.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents