Similar Projects
Churchmans Complex Maintenance Base "D" Garage Electrical Upgrade
Alteration
Bidding
$500,000 est. value
New Castle, DE 19720

Delcastle Technical High School HVAC Replacement Bid Phase 2 - Bid Package 2 26A - Electrical
Alteration
Sub-Bidding
$70,000 est. value
Wilmington, DE 19804

Replace 69kV Utility Poles Phase II
Post-Bid
$250,000 to $500,000 est. value
DE

Diesel Generator
Post-Bid
New Castle, DE

AASF Cold Storage PV Solar Array
Results
New Castle, DE 19720

Installation of Emergency Generator and Automatic Transfer Switch at the Cherry Island Landfill Gas Flare
Results
Wilmington, DE 19809

LMI Solar Pilot Program
Alteration
Post-Bid
Dover, DE

Northwest Booster Station Generator
Results
Newark, DE 19711

Dagsboro RC Roof Mounted PV Solar Array
Alteration
Post-Bid
Dagsboro, DE 19939

Emergency Generator Maintenance
Term Contract
Results
Seaford, DE

Furnish and Deliver Fifty (50) Electric Operated Valve Actuators
Term Contract
Post-Bid
Milford, DE 19963

PME-9 Switchgear and Primary Metering Cabinets for Stock
Results
Dover, DE

Woodbridge Early Childhood Education Center Electrical Service Replacement
Alteration
Post-Bid
Greenwood, DE 19950

Lighting Improvements
Results
Seaford, DE

Dover SB MACC D/B Construct North Substation Transformer Stands, B614
Alteration
Post-Bid
$100,000 est. value
Dover, DE

Reported 07/07/2022 12:00 AM
Project Title

Authority-wide Electrical Inspection, Testing and Preventive Maintenance

Physical Address View project details and contacts
City, State (County) New Castle, DE   (New Castle County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project work generally consists of, but is not limited to, furnishing all labor, materials and equipment necessary to perform Inspection, Testing and Preventive Maintenance of our electrical infrastructure within the Voltage range of 480v - 15kV. It is the desire of the Authority to enter into a three-year agreement with a Contractor capable of providing the services outlined Project Specifications. The Authority has developed a 3-year staggered test schedule for all of our Electrical Infrastructure asset work across all of our facilities.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents