Similar Projects
Last Updated | 07/18/2023 09:10 AM |
Project Title | Surface Lot 73 - Construct Stall Expansion |
Physical Address | View project details and contacts |
City, State (County) | Iowa City, IA 52246 (Johnson County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,021,500 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Targeted Small Business (TSB): The certified Iowa TSB participation goal for this project is 10 percent (10%) of the Base Bid Surface Lot 73 - Construct Stall Expansion SUMMARY OF WORK a. Project Location: Work shall be performed under this Contract on the campus of the University of Iowa at Lot 73, 1360 Melrose Avenue. b. The Constructor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings dated June 15, 2023. c. Work shall include everything requisite and necessary to finish work properly, notwithstanding that not every item of labor or materials or accessories required to make project complete may be specifically mentioned. d. General Description of Work: 1) Project consists of but is not limited to tree removal, pavement removal, retaining wall removal, miscellaneous removals, excavation, biocell construction (modified soil, choker stone, clean aggregate, and topsoil), detention basin construction, subdrain, subdrain cleanouts, erosion control blanket, modified subbase, asphalt paving, concrete driveway, pedestrian ramps/detectable warning, pavement markings, perimeter construction fence, temporary traffic control, tree protection, SWPPP management, silt fence/compost filter tube, HDPE telecommunication conduit (trenchless), handholes, new light pole bases, sod, and construction survey. 2) Alternates: None 3) Allowances: Allowances shall include the costs of materials, supplies and equipment delivered to the Worksite, less applicable trade discounts and including requisite taxes, and unloading and handling at the Worksite, unless specifically stated otherwise. The Constructor's Overhead and profit for the allowances shall be included in the Contract Price, but not in the allowances. The Contract Price shall be adjusted by Change Order to reflect the actual costs when they are greater than or less than the allowances. Allowance 1: Overexcavation and Placement of Geogrid and Modified Subbase - Contractor shall include an allowance in the Contract Sum (Base Bid) in the amount of One Hundred Thousand Dollars ($100,000) for overexcavation and placement of geogrid and 6" modified subbase. 4) Unit Prices: None |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |