Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

OSC Cooling Tower Replacement
Term Contract
Post-Bid
Lake Placid, NY 12946

Foley AC-1 Replacement Project
Results
Albany, NY 12207

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

New Climate Control System-West Haverstraw Village Community Center Gymnasium
Post-Bid
West Haverstraw, NY 10993

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

HVAC Project
Post-Bid
Mechanicville, NY 12118

Campus Center AC-2 Upgrade
Results
Albany, NY

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Heating, Ventilating and Air Conditioning (HVAC) Contractors
Term Contract
Post-Bid
Fishkill, NY 461052

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

NextGen HVAC Technology Challenge
Term Contract
Post-Bid
Albany, NY 12203

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Maintenance and Repair of HVAC
Post-Bid
NY

Reported 06/03/2020 12:00 AM
Project Title

Geneva Tower VRV HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13205   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Qualified Bidding.
Project Status Bidding by Invitation, Construction Start Expected June 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of work to renovate the HVAC system at Geneva Tower. The existing VRF heat pump system serves floors 3-21 and consists of roof-mounted air-cooled condensers piped with refrigerant to indoor fan coils located in each apartment. Each floor is served with a single heat pump serving multiple apartments, and there is not any supplemental heating at the fan coils. The existing VRF system serving floors 1 and 2 is separate from the system serving floors 3-21; these two floors have air-cooled VRF condensing units located at grade. Both systems will be converted to a single, water-cooled heat pump system, as illustrated and specified on the attached documents. A water-cooling loop will be installed with heat adders (boilers), pumps, and fluid coolers at the roof level, and water piping will be extended from top of building (penthouse) to the ground floor. The new VRF water-cooled heat pumps will be installed at each floor level of the building, to serve the apartments on that floor. The existing fan coil units will not be replaced. All related services for this project, including but not limited to phased demolition, rigging, general construction, supports and roofing, electrical, plumbing, fire protection, controls and mechanical work, is to be included.

Details

Apartments/Condominiums, Renovation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents