Similar Projects
Dental Care Associates
Renovation
Conception
New Rochelle, NY

Edward Jones Office Alterations And Renovations
Renovation - 6,943 SF
Conception
North Castle, NY

Commercial Building
New Construction - 16,000 SF
Design
Yorktown Heights, NY 10598

Hylan Crossing Business Park
New Construction - 450,000 SF
Design
$10,000,000 CJ est. value
Henrietta, NY 14467

Main Street Apartments
New Construction - 160,000 SF
Post-Bid
$51,000,000 est. value
Peekskill, NY 10566

2020 Power Wash and Painting at Fifteen Sites
Renovation
Post-Bid

Baseball Clubhouse and Stadium Enhancements
Results
Binghamton, NY 13902

Cascadilla Boathouse Restoration
Renovation - 9,465 SF
Results
Ithaca, NY 14850

Saint Regis Residences Rye
New Construction, Demolition - 245,000 SF
Construction
$100,000,000 est. value
Rye, NY 10580

True Bethel Gardens
Renovation - 41,000 SF
Construction
$8,000,000 est. value
Niagara Falls, NY 14305

Center East
New Construction - 596,000 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY 10065

Project Commodore
New Construction - 2,143,000 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY 10017

Lighting Manufacture Renovation
Renovation - 88,000 SF
Conception
$5,800,000 est. value
Kingston, NY 12401

Former DPW Re-Development
New Construction - 38,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Beacon, NY 12508

Utica LDS Mission Office
Renovation
Post-Bid
Utica, NY

Reported 09/04/2021 12:00 AM
Project Title

Monster Golf Maintenance Building

Physical Address View project details and contacts
City, State (County) Kiamesha Lake, NY 12751   (Sullivan County)
Category(s) Commercial, Entertainment/Recreation, Industrial/Manufacturing
Sub-Category(s) Clubhouse/Social Club, Industrial Warehouse, Office
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a pre-engineered metal maintenance building, golf cart storage building, and clubhouse. These shall be built at various locations on the Monster Golf Course at Resorts World Catskills as indicated in the site plans.

Details

9,850 SF - 1 Office, 1 Story Above Grade, 1,850 SF New Construction, 1 Industrial Warehouse, 1 Story Above Grade, Approximately 8,000 SF New Construction, 1 Clubhouse/Social Club, 1 Story Above Grade, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents