Similar Projects
2022 Asphalt Paving
Infrastructure
Post-Bid
Montrose, CO 81403

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

2022 Asphalt Chip Seal Project
Infrastructure
Results
Montrose, CO 81403

2021 Asphalt Overlay Project
Post-Bid
Montrose, CO

SH 141 North of Naturita Surface Treatment
Results
$5,000,000 to $20,000,000 est. value

Woodgate Road Realignment Project
Results
$1,000,000 to $1,500,000 est. value
Montrose, CO 81402

Hill Street Extension Project
Infrastructure
Results
$1,200,000 est. value
Montrose, CO 81403

Montrose County Justice Center South Driveway Replacement Project
Infrastructure
Post-Bid
Montrose, CO 81401

Moving Montrose Forward 2022 Street Maintenance Project
Infrastructure
Post-Bid
Montrose, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Overlay Project in Several locations within the County
New Construction, Infrastructure
Results
$5,000,000 to $20,000,000 est. value
CO

2021 Hot Mix Asphalt (East End)
Post-Bid
Montrose, CO

2021 Asphalt Rejuvenating Agent Project
Post-Bid
Montrose, CO

Last Updated 04/22/2022 02:22 AM
Project Title

MoveMo 2022 Surface Treatment Project

Physical Address View project details and contacts
City, State (County) Montrose, CO   (Montrose County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of furnishing and placing a mixture of an approved emulsified asphalt, mineral aggregate, water, and specified additives, proportioned, mixed and uniformly spread in conformance to the Contract and to the dimensions as shown on the plans. The completed slurry seal shall leave a homogeneous mat and adhere firmly to the underlying pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents