Similar Projects
Underfloor Sewer Replacement at Ferndale Junior-Senior High School
Bidding
$290,000 est. value
Johnstown, PA 15905

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Wastewater Collection System
Post-Bid
Cresson, PA 16630

Sanitary Sewer Cleaning
Results
Johnstown, PA 15905

Replace Defective Sewer Laterals In Laurel Avenue - Phase 1
Results
Cresson, PA 16630

Wastewater System Replacement
Post-Bid
Lorain, PA 15902

Sanitary Sewer Rehabilitation Project Phase I
Results
Johnstown, PA 15901

Clinton Street Interceptor Rehabilitation Project
Post-Bid
Johnstown, PA 15901

Sanitary Sewer Rehabilitation Project Phase II
Results
Johnstown, PA 15901

Wastewater Collection System Extension
Post-Bid
Carrolltown, PA 15722

Sanitary Sewer Rehabilitation Project
Results
Ebensburg, PA

Route 403 PADOT Paving Coordination Manhole Frames and Covers
Post-Bid
Johnstown, PA 15901

2020 Pressure Sewer Extension Project
Results
Johnstown, PA 15504

Sewer Main Installation on West Horner Street
Results
Less than $12,000 est. value
Ebensburg, PA 15931

Hill Alley Sanitary Sewer Replacement
Results
Franklin, PA 16323

Last Updated 08/03/2020 08:35 AM
Project Title

Sewer Main Installation on North Cherry Street

Physical Address View project details and contacts
City, State (County) Ebensburg, PA 15931   (Cambria County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new 6” sewer main along the 400 block of North Cherry Street, a distance of 160 LF. The project begins at the rear of 127 West Horner Street where a new section of 6” SDR has already been installed. The contractor will locate the end of that 6” SDR pipe (4 feet deep), install a new wye connection to maintain service to 127 West Horner Street, and then extend that 6” pipe north in Cherry Street a distance of 160 LF. A new manhole is to be placed at the intersection of Alton and Cherry, estimated depth to invert is 9 feet. The manhole is to intersect the existing 6” terra cotta main serving Holy Name Church and direct flow to Horner St. Connection to existing main to be done with reinforced Fernco unless pipe can be connected directly to new manhole. When the manhole is placed the old main is to be cemented shut. Contractor will locate the existing lateral from 128 Alton St. and connect to new main at the property line with an observation port. After connection is made the old lateral is to be capped at the rear of 127 Horner St. Contractor will verify depth and location of existing main from Church prior to beginning construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents