Similar Projects
Bridge Replacement, Other Construction
Demolition, New Construction, Infrastructure
Design
$1,062,221 CJ est. value
Rushville, IN 46173

Bridge Replacement, Other Construction
Demolition, New Construction, Infrastructure
Design
$1,062,221 CJ est. value
Rushville, IN 46173

Bridge Rehabilitation Or Repair On CR 150N
Infrastructure
Bidding
$1,288,000 CJ est. value
Rushville, IN 46173

Bridge Rehabilitation Or Repair On CR 150N
Infrastructure
Bidding
$1,288,000 CJ est. value
Rushville, IN 46173

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Two HMA Overlays, Small Structure Replacement and Small Structure/Drain Replacement
Infrastructure
Results

RFP Engineering - Project Development Services
Demolition, New Construction, Infrastructure
Pending Verification
$9,455,774 CJ est. value
Rushville, IN 46173

RFP Engineering - Project Development Services
Demolition, New Construction, Infrastructure
Pending Verification
$9,455,774 CJ est. value
Rushville, IN 46173

Orphan Wells - Rush, Hancock, and Henry Counties
Infrastructure
Post-Bid
$200,000 CJ est. value
Rushville, IN 46173

Asphalt Resurface
Infrastructure
Results
IN

Diamond Pet Foods
New Construction, Infrastructure - 700,000 SF
Pending Verification
$259,000,000 CJ est. value
Rushville, IN 46173

Bridge No. 17 on Rushville Road Over Gilson Creek
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Rushville, IN 46173

8th Street Reconstruction, Phase 3
Infrastructure
Results
Rushville, IN

Last Updated 02/06/2023 04:37 AM
Project Title

15th St, Park Rd, and Sexton St Road Rehabilitation

Physical Address View project details and contacts
City, State (County) Rushville, IN 46173   (Rush County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $120,969 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any proposals received after the above-designated time will be returned unopened. The proposed construction will include ADA ramp construction, new sidewalk, curb, reconstruction of 15th Street, storm sewers, milling of the Sexton Street and Park Road with a 1.5-inch HMA surface overlay along with pavement markings and all incidental work required, as more fully specified in the Contract Documents and Plans. All proposals shall be for complete construction only and must be submitted on State Board of Accounts Form No. 96 together with the proper forms included in the Contract Documents, the entire set of which shall be filed intact as a bid. The bid envelope must be sealed and have the words CITY OF RUSHVILLE 15th Street Reconstruction Project legibly written on the front. Bidders shall assure that they have obtained complete sets of drawings and Contract Documents and shall assume the risk of any errors or omissions in bids prepared in reliance on incomplete sets of drawings and Contract Documents. SECURITY: Any person, firm or corporation who submits a proposal MUST file with their bid a CERTIFIED CHECK, BANK DRAFT, CASHIERS CHECK OR MONEY ORDER issued by a financial institution insured by an agency of the United States in the amount of five percent (5%), made payable to the Clerk-Treasurer of the City of Rushville. In lieu of the above, any person, firm or corporation who submits a proposal and has a principal place of business in the State of Indiana MAY file with their proposal a BID BOND in the amount of five percent (5%), made payable to the ClerkTreasurer of the City of Rushville. Proposals may be held by the City of Rushville Board of Public Works and Safety for a period not to exceed sixty (60) calendar days from the public opening, The successful Contractor will be required to furnish a Performance Bond and Payment Bond in the amount of one hundred percent (100%) of the contract price, each, within ten (10) days after award of the contract and a two (2) year Maintenance Bond in the amount of thirty percent (30%) of the contract price prior to completion and final payment of the contract. No Contractor may withdraw his proposal within sixty (60) days after the actual date of the opening thereof. The City of Rushville Board of Public Works and Safety reserves the right to ask for clarification for any bid submitted. In comparing bids, consideration will not be confined to price only. The successful bid will be the lowest responsible and responsive bidder, however the City reserves the right to reject any proposal, to waive technicalities or irregularities therein, to delete any bid item or items and to award a contract on the proposal that in their judgment is most advantageous to the City.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents