Similar Projects
University View Academy
Renovation - 10,800 SF
Bidding
$1,500,000 est. value
Baton Rouge, LA 70808

Construction Management at Risk Services for the East Ascension High School Makeover
New Construction
Bidding
Gonzales, LA 70737

St. Bernard Christian Academy
New Construction - 40,239 SF
Post-Bid
Meraux, LA 70075

Sulphur 9th Grade School
Renovation
Post-Bid
Calcasieu, Sulphur, LA 70663

Ralph Wilson, Combre and Molo Hurricane Restoration
Renovation
Results
Calcasieu, LA

Restoration of Hurricane Damage to the Cafeteria/Band Building at Gueydan High School
Renovation, Infrastructure, Alteration
Results
LA

The Career Center
Renovation - 132,881 SF
Construction
$10,000,000 CJ est. value
New Orleans, LA 70116

Great Hearts Charter School - South
New Construction - 35,376 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70810

Great Hearts Charter School - North
New Construction - 70,607 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70810

Fontainebleau High School - Additions
Addition
Bidding
$19,654,000 est. value
Covington, Mandeville, LA 70471

Hurricane Laura Damages Restoration to CPSB Administration Building
Renovation
Post-Bid
Lake Charles, LA 70615

New Field House Building at Acadiana High School
New Construction
Results
$2,000,000 est. value
Lafayette, LA 70506

St. Tammany Junior High School Elevator Addition
Addition
Bidding
Slidell, LA 70458

Hurricane Repairs Vinton Middle School
Renovation
Post-Bid
Vinton, LA

Dequincy Area Schools Hurricane Restoration
Renovation
Results
DeQuincy, LA 70633

Reported 10/21/2021 12:00 AM
Project Title

Restoration of Hurricane Damage at North Vermilion High and Middle Schools

Physical Address View project details and contacts
City, State (County) Maurice, LA 70555   (Vermilion County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of the restoration of storm damage to the High and Middle School Campus’s Main and Ancillary and Modular Buildings. The project includes exterior masonry wall repair, restoration and sealing along with replacement of the built-up roofing system at the High School Main Academic Building. The Project also includes various roof, wall and exterior building envelope repairs at various other buildings on the High School and Middle School Campus. Additionally the project includes restoration and repair of interior wall, ceiling and floor finishes as well as related building Mechanical and Electrical components and other minor damaged site and/or building components

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents