Similar Projects
Stark and Hogan TIF - 520500 - City of Gresham
Infrastructure
Conception
$1,170,789 CJ est. value
Gresham, OR 97030

Stark and Hogan TIF - 520500 - City of Gresham
Infrastructure
Conception
$1,170,789 CJ est. value
Gresham, OR 97030

Modera Main Street / Portland
New Construction, Infrastructure
Design
$128,000,000 CJ est. value
Portland, OR 97205

Modera Main Street / Portland
New Construction, Infrastructure
Design
$128,000,000 CJ est. value
Portland, OR 97205

Naval Operational Support Center (NOSC)
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Portland, OR 97217

NW 9th - NW Hoyt Street System Improvements - CM/GC
Infrastructure
Post-Bid
OR 97209

Latourell Creek Bridge
New Construction, Infrastructure
Results
$950,000 to $1,050,000 est. value
Corbett, OR 97019

I-84: Multnomah Falls - Toothrock Tunnel - Cascade Locks
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
OR

RFP Construction Manager - Gateway Center New Construction
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Portland, OR 97201

58th Drive Industrial Building
New Construction, Infrastructure - 1,848 SF
Pending Verification
$1,000,000 CJ est. value
Portland, OR 97206

Gradin Sports Park Development - CIPPK00001 - City of Gresham
New Construction, Infrastructure
Conception
$4,540,020 CJ est. value
Gresham, OR 97080

US 30: Sandy River - OR 35
Infrastructure
Design
$371,130 CJ est. value
Portland, OR 97213

99E MP - 4.48 to 4.86 Pavement Repair
Infrastructure
Post-Bid
Portland, OR 97239

Cornelius Pass Road Arterial Corridor Management Project On The Cornelius Pass Highway (RT. No. OR127) Near Portland
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

240 SE Grand Ave Residential Building
New Construction, Infrastructure - 120,000 SF
Pending Verification
$34,000,000 CJ est. value
Portland, OR 97214

Last Updated 03/29/2023 01:04 AM
Project Title

NE Columbia Boulevard: Cully Boulevard and Alderwood Road

Physical Address View project details and contacts
City, State (County) Portland, OR 97218   (Multnomah County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,331,069 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE : https://www.portlandoregon.gov/cbo/article/785597 This project will construct a traffic signal at the intersection of NE Alderwood Rd and NE Columbia Blvd. The project will also include evaluation and preliminary design of a paired traffic signal at NE Cully Blvd. The project is a joint project with the Port of Portland. Construction is planned for 2019. The project will be negotiating ROW in 2021 and start construction in summer of 2022. Project is included City of Portland FY 2021 - 2022 CIP Page 341. ---------------------------------------------------------------------------------------------------------------------------------- www.portlandoregon.gov/cbo/article/764228 This project will construct a traffic signal at the intersection of NE Alderwood Rd and NE Columbia Blvd. The project will also include evaluation and preliminary design of a paired traffic signal at NE Cully Blvd. The project is a joint project with the Port of Portland. Construction is planned for 2019. Project is included City of Portland FY 2020-2024 CIP Page 327 _________________________________________________________________________________________________________________________________ Install or replace a signal and construct a taper on Columbia Blvd's east leg at Alderwood for future side-by-side left-turn lanes between Cully and Alderwood. Construct sidewalks at the Columbia/Alderwood intersection and on N side to Cully. As of March 29, 2023, the project is in Final Planning planning status. Anticipated letting year 2024. ODOT - NE Columbia Boulevard: Cully Boulevard and Alderwood Road *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents