Similar Projects
Rye Loop Road Culvert Reconstruction
Bidding
Bryan, TX 77803

National Center for Therapeutics Manufacturing (NCTM)Parking Lot
Bidding
College Station, TX 77845

Culverts
Post-Bid
TX

2019 Parking Lot Maintenance
Post-Bid
Bryan, TX

Cherry Creek Circle Drainage Improvements
Results
Bryan, TX

Linda Lane Waterline, Driveway and Culvert Improvements
Results
Bryan, TX

Seal Coat & Stripe Parking & Entries
Post-Bid
College Station, TX 77843

Rock Prairie Management District No 2 - Midtown Reserve Subdivision Phase 100
Results
College Station, TX 77840

36" Pedestrian Crosswalk System
Term Contract
Post-Bid
College Station, TX 77845

Street Curb and Gutter Services
Results
College Station, TX

Parking Area 19 Reconstruction
Post-Bid
College Station, TX

Georgie K. Fitch Park Trail
Results
Less than $285,000 est. value
College Station, TX 77840

Sheep Feeding Expansion Building
Post-Bid
College Station, TX 77845

Jane Long Intermediate School Detention Pond
Results
Less than $40,000 est. value
Bryan, TX 77803

Installation of Driveway Pipe
Results
Less than $608,560 est. value
TX

Reported 03/27/2019 12:00 AM
Project Title

Parking, Grading, and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Bryan, TX 77801   (Brazos County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency - 03/05/19
Owner View project details and contacts
Architect View project details and contacts
Description General Contractor services for the construction of parking, grading, and drainage Improvements at the Walter C Schwartz building on the RELLIS Campus. The Scope of work for the project will include the following: 1. Stripping and stockpiling topsoil from the grading area. 2. Importing, placing, and grading fill. 3. Cutting of a channel from the parking area to 4th Street. 4. Spreading stockpiled topsoil and seeding and sodding of disturbed areas. 5. Installation of new RCP storm sewer. 6. Installation of new parking lot lighting, including relocating existing poles, providing new poles and concrete bases, and electrical conduit and wiring. 7. Construction of a new concrete parking area including pavement markings. 8. Construction of a new access gate island including provision of equipment, electrical and IT connections. 9. Cleanup of site and removal of erosion control measures after establishing suitable ground cover. 10. Close coordination will be required between the contractor, the Blinn College owner's representative, and the contractor for the adjacent 8004 building renovation.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents