Similar Projects
OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

South Shore Elementary School Modular Classroom Relocation - Bid Packages 1 to 4
Renovation, Infrastructure
Bidding
$200,000 est. value
Albany, OR 97322

2022 Downtown Salem Streetscape Project
Infrastructure
Bidding
$890,000 est. value
Salem, OR

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

2022 East 2nd Street Improvements
Infrastructure
Bidding
$320,000 est. value
Yachats, OR 97498

Susan Campbell Sidewalk Improvement Project
Infrastructure
Post-Bid
Eugene, OR 97403

Day Care Building - ADA Improvements
Renovation, Alteration
Results
$150,000 est. value
Lakeview, OR 97630

Forest Grove FY23 Street Improvements - Pavement and Curb Ramp Improvements, D Street Improvement (Pacific to 19th and 19th to 18th)
Infrastructure
Bidding
$1,140,000 to $1,460,000 est. value
Forest Grove, OR 97116

South West 209th Avenue Kinnaman Road to Alexander Street Precast Concrete Pipe and Structures
Alteration
Post-Bid
Hillsboro, OR 97129

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

Parking Lot Striping - 2022
Infrastructure
Bidding
$170,000 est. value
Salem, OR

Columbia Children's Arboretum Improvement Project
Alteration
Post-Bid
Portland, OR

Reported 05/12/2022 12:00 AM
Project Title

Covered areas, Concrete Slabs, and Sidewalks

Physical Address View project details and contacts
City, State (County) Brookings, OR 97415   (Curry County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete High School Wood shop Slab - Dig out - 2 Drain boxes installed - Fill and Compact 3/4 minus Gravel - Bench / Curb to be poured on Art room side - Tapering stairs as you enter area - Broom Finish and control joints to spec - Approximately 2414 sq.ft Concrete High School / Teachers Break Area - Dig out - 1 Drain box installed - Fill and Compact 3/4 minus gravel - Broom Finish Control Joints - Approximately 2292 Sq. ft. Roof Covering 24' x 21' - Engineered Concrete footings and structure - Low Pitch shed roof - Constructed out of wood - TPO Roofing - Paint to match rest of buildings ( no electrical) General High School Lunch Room Cover - Dimensions 26'x 40' / Height 10' to 14'6" - Cut out existing Concrete and pour new Footings - Pour sauna tube supporting post to match other structures - Beams and roof framing to be constructed out of wood - Standing Seam Roofing to match other structures - Paint to match other structures - Remove the Trees and Pour a broom finished slab in the area (No electrical) General High School Gibney - Pour large sidewalks - Dimension 10' x 257' - Dig out - Fill and Compact 3/4 minus gravel - Broom Finish Control Joints - Approximately 2570 sq. ft. General High School Parking lot lunch room area - Pour concrete in bush and planter area - Demo 2 side walks and remove the bushes - Dig out - Fill and Compact 3/4 minus gravel - Broom finish and control joints - Approximately 1515 sq. ft. - Take down and install of existing chain link fence to be done by others General Bridges Covering - Dimensions 32' x 24' Height to match existing roof line - Fill and Compact Slab area with 3/4 minus Gravel - Pour large Footings for posts - Pour slab - Construct entire covering out of wood - soffits to be enclosed with hardie material - paint to match building - Built to engineering specs - Bring in dirt to raise Grade area so water doesn't pool up any more (No electrical) Middle School Play ground cover - Dimensions 75'x75' x 16' tall - Remove some play ground equipment grade lot - Dig out footings - Pour new footings - Construct new metal covering all 4 sides to be open - Color option up to school district - Engineered footing and building ( no electrical) K-School Play Covering for kindergarten area - Dimensions 30' x 35' x 14'tall - dig out footings - Pour Footings - Construct play covering out of Wood - Gabled roof - Asphalt shingle roof - Paint to match other structures - Put back rubber bark for ground covering - Engineered footings and building ( no electrical) K-School Entry -Dimensions 9'x60'x 10'tall - dig and cut out concrete for new footings - Pour new footings - Pour sauna tube supporting post to match other structures -Beams and roof framing to her constructed out of wood - TPO Roofing - Flat roof Design - Over all look to match all other structures - Paint to match other structures - Engineered footings and structure ( no electrical) General K-School special needs area - Dimensions 49' x 12'6" - Dig out - Fill and Compact 3/4 minus Rock - Broom Finish and control joints - Approximately 612 sq. ft.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents