Reported | 05/12/2022 12:00 AM |
Project Title | Covered areas, Concrete Slabs, and Sidewalks |
Physical Address | View project details and contacts |
City, State (County) | Brookings, OR 97415 (Curry County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Concrete, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Concrete High School Wood shop Slab - Dig out - 2 Drain boxes installed - Fill and Compact 3/4 minus Gravel - Bench / Curb to be poured on Art room side - Tapering stairs as you enter area - Broom Finish and control joints to spec - Approximately 2414 sq.ft Concrete High School / Teachers Break Area - Dig out - 1 Drain box installed - Fill and Compact 3/4 minus gravel - Broom Finish Control Joints - Approximately 2292 Sq. ft. Roof Covering 24' x 21' - Engineered Concrete footings and structure - Low Pitch shed roof - Constructed out of wood - TPO Roofing - Paint to match rest of buildings ( no electrical) General High School Lunch Room Cover - Dimensions 26'x 40' / Height 10' to 14'6" - Cut out existing Concrete and pour new Footings - Pour sauna tube supporting post to match other structures - Beams and roof framing to be constructed out of wood - Standing Seam Roofing to match other structures - Paint to match other structures - Remove the Trees and Pour a broom finished slab in the area (No electrical) General High School Gibney - Pour large sidewalks - Dimension 10' x 257' - Dig out - Fill and Compact 3/4 minus gravel - Broom Finish Control Joints - Approximately 2570 sq. ft. General High School Parking lot lunch room area - Pour concrete in bush and planter area - Demo 2 side walks and remove the bushes - Dig out - Fill and Compact 3/4 minus gravel - Broom finish and control joints - Approximately 1515 sq. ft. - Take down and install of existing chain link fence to be done by others General Bridges Covering - Dimensions 32' x 24' Height to match existing roof line - Fill and Compact Slab area with 3/4 minus Gravel - Pour large Footings for posts - Pour slab - Construct entire covering out of wood - soffits to be enclosed with hardie material - paint to match building - Built to engineering specs - Bring in dirt to raise Grade area so water doesn't pool up any more (No electrical) Middle School Play ground cover - Dimensions 75'x75' x 16' tall - Remove some play ground equipment grade lot - Dig out footings - Pour new footings - Construct new metal covering all 4 sides to be open - Color option up to school district - Engineered footing and building ( no electrical) K-School Play Covering for kindergarten area - Dimensions 30' x 35' x 14'tall - dig out footings - Pour Footings - Construct play covering out of Wood - Gabled roof - Asphalt shingle roof - Paint to match other structures - Put back rubber bark for ground covering - Engineered footings and building ( no electrical) K-School Entry -Dimensions 9'x60'x 10'tall - dig and cut out concrete for new footings - Pour new footings - Pour sauna tube supporting post to match other structures -Beams and roof framing to her constructed out of wood - TPO Roofing - Flat roof Design - Over all look to match all other structures - Paint to match other structures - Engineered footings and structure ( no electrical) General K-School special needs area - Dimensions 49' x 12'6" - Dig out - Fill and Compact 3/4 minus Rock - Broom Finish and control joints - Approximately 612 sq. ft. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |