Similar Projects
New Public Safety Facility
New Construction
Conception
Waukee, IA 50263

RFP Design - Woodward Resource Center Utility Decentralization
Renovation
Conception
$300,000 CJ est. value
Woodward, IA 50276

Southfork Drive Culvert Repairs
Infrastructure
Design
$163,316 CJ est. value
Waukee, IA 50263

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Design
$400,000 CJ est. value
Clinton, IA 52732

Cedar River Park Baseball / Softball Development Phase 3
New Construction, Infrastructure
Bidding
$3,210,000 CJ est. value
Waverly, IA 50677

Clay County Attorney and Veteran Services Renovation
Renovation, Infrastructure
Bidding
$800,000 CJ est. value
Spencer, IA 51301

Cedar Falls High School Natatorium
New Construction, Infrastructure - 37,000 SF
Sub-Bidding
$13,400,000 CJ est. value
Cedar Falls, IA 50613

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

27th Street Corridor Site Work
Infrastructure
Results
$753,800 est. value
Cedar Falls, IA 50614

Grading - U.S. 30
Infrastructure
Results

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

156th Street and Waterford Road - TR19-01 - City of Urbandale
Infrastructure
Conception
Urbandale, IA 50323

Riverview Skate Park Improvements Project
Infrastructure
Design
$522,024 CJ est. value
Clinton, IA 52732

Last Updated 08/22/2022 02:03 AM
Project Title

Peace Plaza

Physical Address View project details and contacts
City, State (County) Hampton, IA 50441   (Franklin County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner reserves the right to reject any or all bids and waive all informalities and irregularities in connection therewith if the same is judged to be in their best interests, and to make a selection, including that of any Alternate Bids, that in their judgment is best suited for the purpose intended for the project. The Work of this project shall consist of a Single Construction Contract including but not limited to the following: 1. General Construction. 2. Electrical Construction, including: Power and Lighting. Replies which revise the Bidding Documents will be issued to all Bidding Document holders of record as Addenda to the Bidding Documents and will become a part of the Contract. The Architect and the Owner will not be responsible for oral clarifications. Upon execution of the Owner-Contractor Agreement, and acceptable submittal of the Certificate of Insurance, the Owner shall issue a Notice to Proceed. Work shall begin within ten (10) calendar days after the date set forth in the Notice to Proceed. The Work shall include: submittal processing, ordering of materials, and general project administration and mobilization. On-site mobilization and construction shall begin no sooner than August 29, 2022. The Owner requires substantial completion for the project by November 18,2022. Final completion within seven (7) calendar days of the substantial completion date. The Bid Security shall be enclosed in a separate envelope, bearing Bidder's name, endorsed as follows: Bid Security Project No. 2021-167 - Greater Franklin County Chamber of Commerce - Peace Plaza, Hampton, IA Each Bidder shall accompany its bid with bid security in a separate sealed envelope, in the amount of five percent (5%) of the Bid (including Alternates), as security that the successful bidder will enter into a contract for the work bid upon. The bidders security shall be in the form of a cashiers check, a certified check, or a bank money order drawn on a FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on AIA Document A310 with corporate surety satisfactory to the Owner. The bid shall contain no condition except as provided in the specifications. All Proposals and Bid Securities must have original signatures. An out-of-state bidder, if awarded a contract, will be required to submit evidence of authorization to do business in the State. An unincorporated out-of-state contractor will be required to furnish evidence of State Department of Revenues receipt of bond guaranteeing payment of state income taxes on profit from project, for each year during construction. Submit inquires pertaining to the bidding documents to ReedWessman, at Atura Architecture, 912 N 13 th Street, Clear Lake, IA 641-357-1923 (voice), reedw@aturaarchitecture.com (e-mail). The Owner reserves the right to waive irregularities and to reject bids in whole or in part. The Bidder shall include all requested Forms and attachments with their submission of the Bid Form; failure to comply may be cause for rejection. No modification of submitted bids will be permitted in any form. No bid may be withdrawn for a period of thirty (30) days after the date of bid opening.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents