Similar Projects
Convenience Store and Self Storage Facility
New Construction - 88,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Acworth, GA 30101

Convenience Store and Retail
New Construction - 5,450 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Smyrna, GA 30067

Kroger Fuel Center #454-09
Renovation
Post-Bid
Marietta, GA 30062

Racetrac #247
Renovation - 3,969 SF
Post-Bid
Marietta, GA 30064

Publix Greenwise #1689 & Shops - Sandy Plains Marketplace
New Construction - 191,678 SF
Construction
$10,000,000 CJ est. value
Marietta, GA 30066

Aldi #61
Renovation, Addition - 19,358 SF
Construction
Smyrna, GA 30080

Kroger #491-07
Renovation
Post-Bid
Atlanta, GA 30319

LiDL #1430
New Construction, Demolition - 29,000 SF
Construction
$5,000,000 est. value
Marietta, GA 30064

Kroger #464-07
Renovation
Post-Bid
Mableton, GA 30126

Kroger GA-442
Renovation - 7,550 SF
Construction
$284,000 est. value
Acworth, GA 30152

Kroger #657-08
Renovation
Post-Bid
Marietta, GA 30066

Kroger #478
Renovation - 63,507 SF
Construction
Marietta, GA 30062

Kroger #298-08
Renovation
Post-Bid
Atlanta, GA 30324

Kroger #498-06
Renovation
Construction
$500,000 est. value
Marietta, GA 30064

Kroger #453-07
Renovation - 62,000 SF
Construction
Powder Springs, GA 30127

Reported 03/04/2019 11:01 AM
Project Title

Next Level Petroleum

Physical Address View project details and contacts
City, State (County) Mableton, GA 30126   (Cobb County)
Category(s) Commercial
Sub-Category(s) Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status All GC Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Supermarket/Convenience Store, 1 Story Above Grade, 7,328 SF New Construction, 1.01 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents