Similar Projects
Reported | 01/08/2020 12:00 AM |
Project Title | Annual Litter Removal Event |
Physical Address | View project details and contacts |
City, State (County) | Mobile, AL 36602 (Mobile County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists principally of providing labor, materials, equipment, insurance, and supervision necessary for collection and disposal of trash and litter as described in the contract documents. The project site is located along the shoreline of Three Mile Creek, the Industrial Canal, Garrows Bend Channel, and Arlington Park in Mobile, Alabama. The Litter Collection Staging Areas are shown on Figures 2 and 5. Collected litter must be transferred to a waste container at a staging area until removed off site for disposal. No heavy equipment is to be used near the wetlands and any damage to the wetlands will be repaired by the contractor. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |