Similar Projects
Last Updated | 04/13/2023 10:17 AM |
Project Title | Septic System Replacement Including New Septic Tanks, Dosing Tanks, and Pressure-dosed Mound Disposal System at the Topinabee Rest Area on I-75 |
Physical Address | View project details and contacts |
City, State (County) | Cheboygan, MI 49721 (Cheboygan County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $715,910 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Septic system replacement including new septic tanks, dosing tanks, and pressure-dosed mound disposal system at the Topinabee rest area on I-75, Cheboygan County. Control Sec NH 16091 Job No 212767A Federal No 23A0378 In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Net classification required for this project is Up to $1M Ea or K MI DOT - 2304 004 - Septic System Replacement Including New Septic Tanks, Dosing Tanks, and Pressure-dosed Mound Disposal System at the Topinabee Rest Area on I-75 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |