Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Trowbridge Farms Subdivision Gravel Road Chip Seal
Infrastructure
Post-Bid
$500,000 CJ est. value
Trowbridge, MI 49799

Water Systems Improvements Division A - Elevated Storage Tank
Infrastructure
Results
$1,816,300 CJ est. value
Cheboygan, MI 49721

Water Systems Improvements Division A - Elevated Storage Tank
Infrastructure
Results
$1,816,300 CJ est. value
Cheboygan, MI 49721

Straits of Mackinac Tunnel Construction - Great Lakes 5 Pipeline Replacement
Infrastructure
Pending Verification
$500,000,000 CJ est. value
Mackinaw City, MI 49701

Straits of Mackinac Tunnel Construction - Great Lakes 5 Pipeline Replacement
Infrastructure
Pending Verification
$500,000,000 CJ est. value
Mackinaw City, MI 49701

Wolverine Community Schools Bid Package #1 - 2022 Bond Projects Elementary School & High School Renovations
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Wolverine, MI 49799

Water Systems Improvements Division B - Mill Street Water Main
Infrastructure
Results
$757,621 CJ est. value
Cheboygan, MI 49721

Orion Cheboygan Renewable Energy Solar Farm
New Construction, Infrastructure
Pending Verification
$90,000,000 CJ est. value
Cheboygan, MI 49721

Hot Mix Asphalt Reconstruction, Concrete Box Culvert Replacement, Drainage, Sanitary Sewer, Signing and Pavement Markings on US-23
Infrastructure
Post-Bid
$15,746,188 CJ est. value
Cheboygan, MI 49721

Water System Improvements Division C - Well Improvements
Infrastructure
Results
$1,779,768 CJ est. value
Cheboygan, MI 49721

Inverness Oaks Condominium
New Construction, Infrastructure
Pending Verification
$4,080,000 CJ est. value
Cheboygan, MI 49721

I-75 Bridge Approaches
Demolition, New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Indian River, MI 49749

Water Systems Improvements Division D - Elevated Storage Tank Rehabilitation
Renovation, Infrastructure
Results
$510,100 CJ est. value
Cheboygan, MI 49721

Last Updated 04/13/2023 10:17 AM
Project Title

Septic System Replacement Including New Septic Tanks, Dosing Tanks, and Pressure-dosed Mound Disposal System at the Topinabee Rest Area on I-75

Physical Address View project details and contacts
City, State (County) Cheboygan, MI 49721   (Cheboygan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $715,910 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Septic system replacement including new septic tanks, dosing tanks, and pressure-dosed mound disposal system at the Topinabee rest area on I-75, Cheboygan County. Control Sec NH 16091 Job No 212767A Federal No 23A0378 In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Net classification required for this project is Up to $1M Ea or K MI DOT - 2304 004 - Septic System Replacement Including New Septic Tanks, Dosing Tanks, and Pressure-dosed Mound Disposal System at the Topinabee Rest Area on I-75

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents