Similar Projects
Main Street Water Main Replacement - Phase 1
Infrastructure
Bidding
$400,000 est. value
Oley, PA 19547

Hilbert Court Water Main Replacement
Infrastructure
Bidding
$150,000 est. value
Five Points, PA 19606

SCTA Reading Operations Facility Sidewalk Replacement Project
Post-Bid
Reading, PA 19604

Emergency Repairs to Water System and Emergency Repairs to Sanitary Sewer System
Term Contract
Post-Bid
Blandon, PA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Perkiomen Ave Pedestrian Access
Results
$1,000,000 to $2,499,999 est. value
PA

Park Road Storm Sewer Project
Infrastructure
Post-Bid
Boyertown, PA 19512

Water Distribution System Upgrades
Results
$3,102,745 to $3,619,869 est. value
Fleetwood, PA 19522

Hall Road and Clarence Avenue Waterline Extension
Results
$150,000 est. value
Shoemakersville, PA 19555

Hilldale Road Storm Sewer Project
Results
Reading, PA 19606

Boyertown Area Fire and Rescue / Liberty Fire Company Stormwater Management Basin Retrofit
Results
Boyertown, PA 19512

2021 Water Main Replacement
Results
Wyomissing, PA 19610

2021 Street and Storm Sewer Improvements Project
Results
Kutztown, PA

18W Hancock and East Wyomissing Boulevards Islands Project
Results
Reading, PA 19606

Pine Street Alley Parking Lot - Low Volume Driveway Project
Results
Boyertown, PA 19512

Reported 02/23/2022 12:00 AM
Project Title

Glen Terrace Improvement Project

Physical Address View project details and contacts
City, State (County) Mount Penn, PA 19606   (Berks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work will consist of replacing the existing stormwater pipe that runs along Glen Terrace. A portion of the replacement will also occur on Center Street and Endlich Avenue. This project also encompasses a water main replacement along Center Street and Glen Terrace. The scope of work will also include some street rehabilitation, as well as new curb and sidewalk.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents