Similar Projects
Roofing 2019 Project
Post-Bid
Marysville, MI

Roofing Replacements Grosse Pointe North High School
Post-Bid
Grosse Pointe, MI

Replace Roofs at Buildings 36 & 2022
Results
$25,000 to $100,000 est. value
Alpena, MI 49707

Repair Roof Bldg 6923
Results
$250,000 to $500,000 est. value
Battle Creek, MI 49037

Building Roof Repair
Post-Bid
Royal Oak, MI 48073

City of Grand Haven Neighborhood Housing Services
Results
Grand Haven, MI

Siprnet Service at Bldg 490, Rm 122, Fl 1, 5884 A St, Alpena, MI 49707 to Bldg 10271, Rm 128, Fl 1, 2721 Sacramento Street, Wright Patterson AFB, OH 45433
Post-Bid
Alpena, MI - Wright Patterson Air Force Base, OH 49707

Wayne RESA Education Center Roof Replacement
Results
Less than $256,520 est. value
Wayne, MI

Roof Program 2020
Post-Bid
Troy, MI

Canton Human Services Center Roof and Soffit Replacement
Results
Less than $44,800 est. value
Canton, MI

Roof System Replacement and Masonry Repairs at Maple Street Magnet
Post-Bid
Kalamazoo, MI

Roof Replacement on the Main Building at Genesee Career Institute
Results
Less than $205,387 est. value
Flint, MI

Replacement of Roofs at Maple Street Magnet School, King-Westwood Elementary School and Northeastern Elementary School
Post-Bid
Kalamazoo, MI

Flat Roof Replacement
Results
$500,000 to $1,000,000 est. value
Detroit, MI 238160

Partial Reroofing Services
Post-Bid
Grand Rapids, MI

Last Updated 12/16/2019 03:15 AM
Project Title

Replacement of the Roof Atsaginaw Fire Station 4

Physical Address View project details and contacts
City, State (County) Saginaw, MI 48602   (Saginaw County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor shall remove all debris from the roof, all materials shall be collected and removed from site, and properly disposed of. The placement of any on site refuse collection bins shall be coordinated with the Fire Department so as to not impede traffic to and from the building. 2. Contractor shall properly prepare existing roof deck for installation of new roofing material, which may include slicing existing rubber roof to remain. 3. Contractor shall install (if applicable) new 1/2” Duro-Fold over any existing rubber roof and fasten down. 4. Contractor shall provide new Duro-Last .040 white membrane roof fastened in accordance with the manufacturers installation instructions. 5. Contractor shall install new Duro-Last curb and pipe flashings. 6. Contractor shall install new Duro-Last termination bar as needed. 7. Contractor shall install new Duro-Last two-way breather vents. 8. Contractor shall install new 24 gauge two-piece snap metal edge as required. (Choice of Standard Color) 9. Contractor shall provide and install Duro-Last walk pad to roof top equipment. 10. Contractor is required to remove and replace any roof top appurtenances necessary for the proper installation of new roofing material.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents