Similar Projects
Home Weatherization Services
Post-Bid
AL

Community Health Services Building 20th Room 348 Replace Cooling Tower
Alteration
Post-Bid
$220,000 to $260,000 est. value
Birmingham, AL 35205

Highlands HVAC Replacement
Results
$450,000 est. value
Birmingham, AL 35233

Birmingham City Schools HVAC Upgrades
Results
Birmingham, AL

UAB Zeigler HX Replacement
Alteration
Post-Bid
$75,000 to $95,000 est. value
Birmingham, AL 35233

Crestline Elementary School 2021 Rooftop Unit Replacement
Results
$382,499 est. value
Mountain Brook, AL 35213

HVAC Services
Alteration
Post-Bid
Birmingham, AL

HVAC Upgrades for the Midfield City Schools
Alteration
Results
Midfield, AL 35221

Spain Wallace Second Floor Molecular Lab Fan Coil Unit Replacement
Alteration
Post-Bid
Birmingham, AL

National Boiler Inspection Services
Term Contract
Results

Central Utilities Chilled Water System Upgrades
Alteration
Post-Bid
$900,000 to $1,200,000 est. value
Birmingham, AL 35233

HVAC Upgrades Installation of Bipolar Ionization or Non-Thermal Plasma Technology for Midfield City Schools
Renovation
Results
Birmingham, AL

Highlands 6th and 7th Floor Air Handler Replacement
Alteration
Post-Bid
Birmingham, AL 35205

HVAC Upgrades Phase II
Alteration
Results
$1,300,000 est. value
Birmingham, AL

Chauncey Sparks Center Room 220 Install Ventilation
Alteration
Post-Bid
$30,000 to $55,000 est. value
Birmingham, AL 35233

Last Updated 11/15/2022 03:16 PM
Project Title

HVAC Roof Top Package Unit Upgrades - II

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,122,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, replacement of existing HVAC Roof Top Package units and/or system, and all related work as indicated on the Bid and Construction Documents. A cashiers check or bid bond payable to Birmingham City Schools, Birmingham, Alabama, in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory Labor and Material Payment Bonds, and insurance in compliance with requirements, will be required at the signing of the Contract. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by Architect or Owner; The bidder shall show such evidence by clearly displaying their current license number on the outside of the sealed envelope in which the proposal is delivered; Bidder must also include their current license number on the Proposal Form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of NINETY (90) days. This project is being bid without sales taxes according to Act 2013-205 (of the Alabama Legislature). However sales tax for the base bid and all other bid items must be accounted for on the contractors Bid Proposal Form. ABC Form C-3A indicates how the sales tax shall be accounted for on the bid proposal form and shall be modified by the project architect as appropriate for bid items on each project. Completion Time: Work shall commence on the earlier of either the date of the owners written Notice to Proceed or the contractors receipt of the fully executed contract and shall be Substantially Complete within 240 Consecutive Calendar Days thereafter. Supervision: Contractor to provide Superintendent (s) to ensure proper supervision for all work. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in their judgment, the best interests of the Owner will thereby be promoted.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents