Similar Projects
Viewing Platform, Signage and Walking Trail
New Construction
Conception
Easton, MD 21601

8001 Wisconsin Avenue - Mixed Use
New Construction, Build-Out - 15,000 SF
Conception
Bethesda, MD

South Lake - Masterplan
New Construction - 560,272 SF
Design
Bowie, MD 20774

Coventry Square Apartments
New Construction
Design
Salisbury, MD

Kent County High School Track Resurfacing
Bidding
Less than $250,000 est. value
Worton, MD 21678

Renovations, Tennis/Basketball Court, Term Contract
Term Contract
Bidding
Towson, MD

CPSC Park Playground Equipment
Post-Bid
Gaithersburg, MD

The Edge At Middelton
New Construction
Post-Bid
Aberdeen, MD 21001

Athletic Track Replacement at North Caroline High School
Results
Ridgely, MD 21660

Improvements to Medal of Honor Triangle
Results
Hagerstown, MD 21740

Laurel Park Station - Phase I
New Construction
Construction
Laurel, MD 20723

The Chase at Quince Orchard
New Construction
Construction
Gaithersburg, MD

545 Bay Street
New Construction, Renovation
Pending Verification
Berlin, MD 21811

Hillman Garage and City Dock Redevelopment
New Construction
Pending Verification
$56,000,000 to $62,300,000 est. value
Annapolis, MD

Middle Branch Waterfront Revitalization
Renovation
Conception
$325,000 est. value
Baltimore, MD

Last Updated 03/15/2021 09:52 AM
Project Title

Construction of Picnic Pavilions

Physical Address View project details and contacts
City, State (County) Emmitsburg, MD 21727   (Frederick County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified contractors for the construction of two (2) small picnic pavilions near the east entrance of Myers Community Park in Emmitsburg. 1. #1 Picnic Pavilion (16’ x 20’): ? Concrete: Grade site, pour footings & 4” concrete slab approximately 16’ x 20’ in size and built to an accessible standard. ? Roof: Metal peak roof standing seam or rib system, color to be light earth tone – no bright or reflective materials, overhang of minimum 1-foot. The roof must be at least 8-feet off the concrete slab at the lowest point to allow for head clearance. ? Hardware: Steel connections to be primed and painted with rust inhibitor. Hardware to be electrostatic zinc plated. 2. #2 Picnic Pavilion (12’ x 12’): ? Concrete: Grade site, pour footings & 4” concrete slab approximately 12’ x 12’ in size and built to an accessible standard. ? Roof: Metal peak roof standing seam or rib system, color to be light earth tone – no bright or reflective materials, overhang of minimum 1-foot. The roof must be at least 8-feet off the concrete slab at the lowest point to allow for head clearance. ? Hardware: Steel connections to be primed and painted with rust inhibitor. Hardware to be electrostatic zinc plated.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents