Similar Projects
Standard Overlay Resurfacing on Hicks Road Approx. 140 Feet S. of Kirchoff Rd. and Extends in a Northerly Direction Approx
Infrastructure
Bidding
IL

(1032-Ft) Channelization and Pavement Widening to Add a Right Turn Lane, Traffic Signal Modernization
Infrastructure
Bidding
$2,000,000 est. value
IL

Weed Cutting Services - Grid Area B
Term Contract
Post-Bid
Chicago, IL 60602

Weed Cutting Services - Grid Area D
Term Contract
Post-Bid
Chicago, IL 60602

Smart Overlay, Class D Patching and ADA Improvement
Results
Brookfield, IL 60513

(1.74-Mile) Improvement
Results
Hillside, Westchester, IL 60162

Resurfacing Shields Avenue From Maple Avenue to Custer Avenue
Infrastructure
Bidding
$4,000,000 est. value
Brookfield, IL 60513

Village Landscape Maintenance Services
Term Contract
Post-Bid
Winnetka, IL

Crack and Joint Sealing on PCC Pavement
Results
Barrington, Hoffman, Palatine, IL

Carl Sandburg Phase 2 Parking Lot Improvements
Infrastructure
Bidding
$313,000 est. value
Rolling Meadows, IL 60008

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

Storm Sewer Cleaning And Televising - Saratoga Farms
Results
Chicago Heights, IL 60411

Green Alley Program - Phase 2
Infrastructure
Bidding
$1,894,155 est. value
Berwyn, IL

Bulk Fertilizer Applications and Turf Products
Post-Bid
Arlington Heights, IL

2021 Melinda/Hiawatha Water and Street Improvements
Results
Buffalo Grove, IL 60089

Last Updated 04/28/2022 01:23 PM
Project Title

2022 Neighborhood Road Improvement Program

Physical Address View project details and contacts
City, State (County) Orland Park, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Landscaping/Irrigation, Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,583,929
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes asphalt roadway re-paving, road base stabilization, storm sewer repairs, pipe underdrains, curb and sidewalk replacement, sidewalk or driveway slab raising, landscape restoration and paving marking improvements at various locations within the Village.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents